Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Property / Flat Number (Photograph of Front Door)

Details of the Property

  • What is the Status of the Property?

Inspection

  • Is this a technical Inspection for Meter Work

  • Is this a Post Meter Audit

  • Meter Fitter's Name

General

  • Does the Operative have access to the appropriate work procedures/ codes of practise?

  • Is the Atmospheric Monitoring Equipment tested in date and used when required?

  • Are G/17 or G/19 in place for meter installations >bar and for all electrical and instrumentation work?

  • Are faults on meter installations reported as per fault finding procedure PM/FAULT/1?

Method of Working

  • Does the Meter Fitter have Two Volt Sticks? (Photographic Evidence)

  • Are they clean and serviceable?

  • Was the Volt Stick used as Appropriate?

  • Has the Volt Stick been "Proved" against a known Electrical Source? (Photographic Evidence)

  • Was the Temporary Continuity Bond used as appropriate? (Photographic Evidence)

  • Was / Is the Meter Location Acceptable? (Photographic Evidence)

  • For external installations; Is the Meter Box fit for purpose and has it been correctly installed? (Photographic Evidence)

  • Has the rear pipe exit of inset meter box been sealed ? (Photographic Evidence)

  • Has the Pipework been installed correctly ?

  • Has the meter bracket been fitted correctly? (Photographic Evidence)

  • Are Cork Washers Fitted?

  • Is the correct meter and materials used for MAM?

  • Has the Meter been installed, exchanged or been removed as per procedure?

  • Are Shear Bolts fitted correctly?

  • Is the ETM securely fixed to the floor / wall ? State Which

  • Are the ETM Battery Compartment Seals Fitted ?

  • Has Flux Spillage and Debris been removed from Stainless Steel Meter Connections ?

  • Has the Testing and Purging Procedure been followed ?

  • Is the Emergency Control Accessible, Operable and falls into the "Off Position"

  • Has the ETM Fault / Maintenance Procedure been followed ?

  • Has a replacement meter regulator been identified and exchanged as per PM/TMP/14 ?

  • Is the Working Pressure at the Meter Outlet Correct and Regulator Sealed ? Detail Pressure (Photographic Evidence)

  • Has the Meter Control Valve been exchanged as per procedure ?

  • Has the earth strap been fitted if meter is being removed longer term ? (Photographic Evidence)

  • Is the "On / Off" Tape attached ? Is it in good condition ? (Photographic Evidence)

  • Is the "Gas Tape" attached ? Is it in good condition ? (Photographic Evidence)

  • Is the Equipotential Bonding correct ?

  • If Equipotential Bonding is incorrect or can't be connected has safety warning card been left ?

  • Was the correct procedure followed if MEB was altered when meter was relocated ?

  • Have MPRN labels been attached and completed where applicable.

  • Visual inspection of Meter Installation / appliances (Photographic Evidence)

  • If Meter / Appliances are deemed as unsafe has an appropriate "Warning / Concern Label been fitted / left with occupier ?

Documentation

  • Is the "Job Reporting Documentation" and Data Capture Correct

  • If there are faults on the meter installation, have these been reported as per the "Fault Finding Procedure" ?

  • Is the Meter Fitter fully aware of the company's accident / incident reporting procedure and the RIDDOR reporting procedure when required ?

Customer Service and Perception

  • Was the appearance of the Meter Fitter appropriate ? (Photographic Evidence)

  • Did the Meter Fitter introduce themselves and show their ID Badge / ID Card ?

  • Did the Meter Fitter explain the nature of their visit, description of the works to be conducted and any necessary safety warnings whilst they were carrying out the works ?

  • Was the Customer's property adequately protected during the works ? (Photographic Evidence for a live audit)

  • Did the Meter Fitter position their tools and equipment safely ?

  • Was there any waste generated ? Was this disposed of correctly and the property left clean and tidy?

  • Were the Correct Customer Care Leaflets / Information Packs Left with the Customer ?

Performance Score

  • Risk Rating of Performance and Installation - 1-4 (High Risk) 5-7 (Medium Risk) 8-10 (Low Risk)

  • Comments / Recommendations

Sign Off

  • Auditors Name

Untitled Page

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.