Audit
Client / Site: Barwon Water - Black Rock WRP Inlet Works Upgrade 400 Black Rock Connewarre
Inspection Area:
Works Description:
Document No. HSE-F-017 ITP No:
Type of plug that is being installed / fitted
Diameter of pipe/ outlet to be isolated
Required holding pressure
Is the plug & pipe connection maintaining the required pressures when tested
Is the pressure controlling device in current calibration
Does the plug & connection show signs of any structural damages, breakages or loose fittings
Does the plug & pipe connection show signs of stress or distortion to integrity
If the plug is anchored or housed to another support connection point, are there any signs this connection is loose or poorly secured
Other Comments