Title Page

  • Site Name:

  • Job No:

  • TML Project Lead:

  • Task:

  • Auditor:

  • Date:

Project Evidence

  • Are the Take 5 RAMS in the folder

  • Is the client Supplied Information Up to date?

  • Has the post site report form been filled out correctly?

  • Has the Topo office report sheet been completed?

  • Has the Utilities office report sheet been completed?

  • Has the 3D Laser Scan office report sheet been completed?

  • Has the correct project evidence been saved in the right location?

LSS

  • Is the raw data files saved in the correct location in a neat and understandable way?

  • Is the traverse report saved in the correct location?

  • Is the flatten point saved in the correct location.

  • Has the contour/ground model evidence been checked and saved correctly?

  • Is the working area in easily identifiable state?

  • Is the final LSS file saved in Final and clear to all it is the latest file?

  • Are the utilities and topo files saved in an organised manner?

  • Is any old data stored and referenced correctly?

AutoCAD

  • Is the dxf saved in the correct location?

  • Is the 2D CAD models saved correctly.

  • Are the floorplans named and saved correctly

  • Are the elevations & sections named and saved correctly?

  • Is the OS data saved in the right location?

  • Are the final CAD files saved in the right location?

  • Has a pdf check plot been created for each CAD file.

  • Is the old data saved and referenced correctly?

  • Have the final files been pdf ready for issue.

Laser Scanning

  • Have all scan data sets been removed from the server?

  • Is the scan data backed up and easily located?

  • Is the Revit Model saved in correct location?

  • Are all associated software files saved correctly?

Other

  • Have the final files been issued and register completed?

  • Are there any photos of the site?

  • Is there a report saved in the correct manner?

  • Is the project folder full of information not in folders?

Standards

  • Pass No further action required. All files correct and saved in the right location.

  • Fail Surveyor must address issues and inform auditor of completion of works. Files are missing or not saved in the right location. Job folders untidy or files named incorrectly.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.