Title Page

  • Site location

  • Inspection date

  • Inspected by

  • Start date

  • End date

  • Project/Programme Reference

  • Contractor and site representive

  • Customer Present

  • Smoke alarms?

  • Location of gas boiler?

Works Inspection Details

  • Kitchen Upgrade

  • Is there a utility room? If so, please provide photographs. Include comments on the extractor, flooring measurements, number of units, fuse spurs, Sure Stop, and any other relevant details.

  • Are infills/plinths/kickboards/shirting fitted correctly?

  • Are all units, backboards, and end panels properly levelled, free from any damage, with doors correctly aligned, and soft closures appropriately fitted?

  • Are all shelves present and fitted correctly?

  • Are drawers fitted correctly and running smoothly?

  • Have splash backs been installed?

  • Are worktops, joints, edging strips and upstands installed correctly and free from any damage?

  • Are all appliance spaces correct and appliances re-installed correctly?

  • Have cut outs been sealed correctly, service pipe holes the correct size, and copper pipe used?

  • Have isolation valves been fitted and are accessible, including sure-stop where stop tap is located in the kitchen?

  • Has boxing been installed where applicable? If yes note where

  • Has new skirting been fitted?

  • Has C02 alarm been fitted, is in correct position and old one removed?

  • Has new LED lighting been installed?

  • Are fuse spurs labelled correctly?

  • Has an extractor fan been installed?

  • Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?

  • Has plastering & decorating been completed to a satisfactory standard?

  • Have radiator(s) and door(s) leaf been painted?

  • Kitchen Snags - Are there any follow up snags? If yes, note how many

  • Bathroom Upgrade

  • Have the correct bathroom fixtures/fittings been used? i.e. WHB/BATH/TOILET/BATH PANEL/SHOWER TRAY

  • Have stickers been removed from fixtures and fittings?

  • Have the wall boards, including splashbacks, been installed to a high standard, properly sealed, and free from sharp edges or any finish imperfections?

  • Has the riser rail for the shower and curtain been installed correctly? If any grab bars were previously fitted, have they been reinstalled properly?

  • Is all silicone sealant installed and to a satisfactory standard?

  • Have isolation valves been fitted, accessible and copper piping used?

  • Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?

  • Has new skirting been fitted?

  • Has boxing been installed where applicable? If yes note where

  • Has plastering and decorating been completed to a satisfactory standard?

  • Have radiator(s) and door(s) leaf been painted?

  • Has extractor fan, isolator switch, LED light and pull cord been fitted?

  • Bathroom - Are there any follow up snags? If yes, note how many

  • Downstairs/additional WC and WHB Upgrade

  • Have the correct bathroom fixtures/fittings been used?

  • Have stickers been removed from fixtures and fittings?

  • Have the wall board for the splashback, been installed to a high standard, properly sealed, and free from sharp edges or any finish imperfections?

  • Is all silicone sealant to a satisfactory standard?

  • Have isolation valves been fitted, accessible and copper piping used?

  • Has new skirting been fitted?

  • Has boxing been installed where applicable? If yes note where

  • Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?

  • Has plastering and decorating been completed to a satisfactory standard?

  • Have radiator(s) and door(s) leaf been painted?

  • Has extractor fan, isolator switch been fitted, LED lighting and pull cord installed?

  • DSWC - Are there any follow up snags? If yes, note how many

  • Window Replacement Checklist

  • Type of window installed

  • Have all windows been installed to a high standard, properly sealed, free from any damage or scratches, and fitted with the correct type of glass?

  • Are all windows operating correctly, trickle vents operational and restrictors present and functional?

  • Has all making good been completed to internal areas around windows?

  • Has all making good been completed to external areas around windows?

  • Are window handles a push button with no locks/keys? If no, please verify whether the customer was provided with keys and kindly request their return.

  • Windows - Are there any follow up snags? If yes, note how many

  • Dwelling Door(s) Replacement

  • Door location?

  • Door material?

  • Does the door open and close freely?

  • Does the lock secure the door firmly within the frame, and are both the thumb turn and door chain present?

  • Are all door numerals, handles, letter-plate, door viewer present and correctly fitted?

  • Has the customer received all the keys or received communal key/information?

  • Has all making good been completed?

  • Dwelling Door(s) - Are there any follow up snags? If yes, note how many?

  • Fire doors - Flats and communal doors

  • Door location?

  • Door material?

  • Are labels or markers present and indicate that the door is certified?

  • Does the door open and close freely? Is a mechanical door closer present, in good condition and free from damage?

  • Are there 3 or more hinges present with no missing screws?

  • Are there any gaps around the door frame?

  • Does the lock secure the door firmly within the frame, and are both the thumb turn and door chain present?

  • Are all door numerals, handles, letter-plate, door viewer present and correctly fitted?

  • Has the customer received all the keys or received communal key/information?

  • Has all making good been completed?

  • Fire door(s) - Flats/Communal - Are there any follow up snags? If yes, note how many?

  • RWG/Roofline - THIS DOES NOT INCLUDE FULL NEW ROOFS

  • Have damaged tile been replaced? If yes how many?

  • Have gutters been renewed and fitted correctly?

  • Have the downpipes been replaced and installed correctly, with all clips in place? Please also note the number of downpipes?

  • Have fascia's & soffits been replaced and installed correctly?

  • Have the satellite dish and BT cables been reinstalled and tidied up where applicable?

  • Does the dwelling have a porch?

  • If yes have RWG/Roof works been completed for porch?

  • RWG/Roofline only - Are there any follow up snags? If yes, note how many

  • Main roof replacement and RWG

  • Type of roof?

  • Have the roof correct tiles/materials been used?

  • Has the valley been pointed and free from debris?

  • Has dry verge been installed?

  • Has the verge or ridge been re-pointed? Include approx. measure

  • Have gutters been renewed and fitted correctly?

  • Have the downpipes been replaced and installed correctly, with all clips in place? Please also note the number of downpipes?

  • Have fascia's & soffits been replaced and installed correctly?

  • Have the satellite dish and BT cables been reinstalled and tidied up where applicable?

  • Does the dwelling have a porch?

  • If yes have RWG/Roof works been completed?

  • Main roof replacement and RWG - Are there any follow up snags? If yes, note how many

  • Secondary Roof Replacement & RWG

  • Type of secondary roof?

  • Type of roof?

  • Have correct tiles/materials been used?

  • Has the valley been pointed and free from debris?

  • Has dry verge been installed?

  • Has the verge or ridge been re-pointed? Include approx. measure

  • Have gutters been renewed and fitted correctly?

  • Have the downpipes been replaced and installed correctly, with all clips in place? Please also note the number of downpipes?

  • Have fascia's & soffits been replaced and installed correctly?

  • Have the satellite dish and BT cables been reinstalled and tidied up where applicable?

  • Secondary Roof - Are there any follow up snags? If yes, note how many

  • Electrical rewire and CCU Checklist

  • Have the correct number of sockets been installed in each room, including 2 USB sockets?

  • Have all chasings been patched in correctly and to a suitable standard?

  • Has new consumer unit been installed, accessible and labelled correctly?

  • New light switches and light pendants been installed throughout?

  • Take photo of meter

  • Rewire/CCU - Are there any follow up snags? If yes, note how many

  • Heating Upgrade Checklist

  • Does boiler appear to be fitted correctly?

  • Flue type?

  • Has the flue been installed correctly (not boxed in) and sealed externally?

  • Is all pipework neat and tidy and suitable clipped to the wall?

  • New radiators installed and how many radiators in property?

  • Do all radiators have new TRV's and lock shields installed?

  • Has timeclock and programmer/thermostat been installed and working correctly?

  • Heating/Rads - Are there any follow up snags? If yes, note how many?

  • Storage Heating /Other Heating Checklist

  • Type of heater installed?

  • How many of each heaters have been installed?

  • Are heaters installed correctly and free from damage?

  • Are heaters floor mounted and fixed to the wall?

  • Water tank location? Take photo

  • Has customer been shown how to use system/heaters?

  • Has making good been completed where old heater has been removed?

  • Electric heating - Are there any follow up snags? If yes, note how many

General Site Details and Sign Off

  • Has the site been left clean and tidy?

  • Has all waste been removed?

  • Is scaffolding present?

  • Has customer reported any issues?

  • Has customer answered satisfaction survey?

  • Overall inspection rating?

  • Places for People Initials

  • Contractor Initials

  • Customer Initials

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.