Title Page

  • CUA No.

  • Nominated Date & Time

  • Inspection Address
  • Inspection Requested by

  • Contact No.

  • Inspection Conducted on

Preliminary requirements

  • Required signs

  • Condition of road/footpath/site fencing

  • Conditions of consent checked

  • Soil Erosion controls in place

  • Trees protected

  • On site material storage

  • Sydney Water plan received?

  • Bushfire conditions discussed?

  • Have conditions been discussed?

  • Termite barrier methods discussed

  • Engineers details received

  • Preliminary Requirements

Site Conditions

  • Site Works (Cut and Fill) in accordance with plan

  • Effect of Site Works on adjoining properties, road, easement

  • Setback from site boundaries and features

  • Site Conditions

Foundations

  • Foundation Material Type

  • Piers/Footings/Slabs

  • Footings/Piers to even bearing

  • Layout as per plan

  • Certificates provided/required

  • Foundations

Comments

  • Comments

  • Photos

Signature

  • Recorded on computer

  • Inspector's Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.