Title Page

  • Audit Title

  • Conducted on

  • Prepared by

  • Personnel

  • Was take 5 completed?

  • Lid secured with 2 Chorus approved screws?

  • Pillar I.D correct

  • Chorus Bags installed correctly?

  • Bags secured with black or neutral cable ties?

  • Correct cable used?

  • Minimum (50mm) cable sheath exposed?

  • Minimum (50mm) before first connectors?

  • Minimum (175mm) barrel height maintained?

  • Correct connectors used?

  • Corroded connectors replaced?

  • Service lead labeled correctly?

  • Unused pairs capped?

  • Encapsulated loop resealed?

  • Fly leads installed correctly?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.