Title Page
-
Audit Title
-
Client / Site
-
Supervisor
-
Conducted on
-
Prepared by
Policy & Procedure
-
Have your employees read Pioneer's "Safety Principles" and agree to follow them?
-
Have your employees read Pioneer's "Rules to Live By" and agree to follow them?
-
All PPE in use where & when required?
-
Are live electrical components de-energized prior to working on or near them?
-
Are JSA's being performed and documented?
-
Are Lock Out / Tag Out procedures being used and documented?
-
Are employees attending Pre-Tour & Safety meetings?
-
Do employees follow all lease or ranch posted speed limits?
Environmental
-
Are Berms in place & functional around all SCE?
-
Is the overflow on Torpedo Tank plumbed back into the Active System?
-
Are drip pans being used?
-
Are all openings in drip pans properly plugged to prevent fluid from escaping drip pan?
-
Are drip pans empty at this time?
-
Is the work area clean of any excess oil & dirt?
Signs & Placards
-
Are "Fall Protection Required " signs posted in all location where needed?
-
Are "Danger High Voltage" signs posted where needed?
Equipment
-
Are all hand rails in place & properly secured?
-
Is grating on shaker tank secure?
-
Are brackets that secure shakers to tank in good condition?
-
Are all pins & keepers for hand rails and walkways in place and secured?
-
Is grating on Polishing Centrifuge Stand secure?
-
Do the legs on the Polishing Centrifuge Stand have proper pins and keepers in place?
-
Is grating on Active Centrifuge Stand secure?
-
Are motors and electrical panels free of excessive oil and dirt?
-
Do the legs on the Active Centrifuge Stand have proper pins and keepers in place?
-
Is the ladder on Polishing Centrifuge Stand properly secured to the stand?
-
Is the effluent line of Polishing Centrifuge secure?
-
Is the ladder on the Active Centrifuge Stand properly secured to the stand?
-
Has blue glue and tap screws been used on the Polishing Centrifuge effluent line?
-
Has blue glue and tap screws been used on the Active Centrifuge effluent line?
-
Is the effluent line of Active Centrifuge secure?
-
Has blue glue and tap screws been used on overflow line from Torpedo Tank?
-
Is connection from effluent discharge on Polishing Centrifuge to effluent line secure?
-
Are all hoses in good condition?
-
Are "goose necks" being used where hoses go over tank top edge?
-
Is connection from effluent discharge on Active Centrifuge to effluent line secure?
-
Are all connections Hammer Unions or Flanged?
-
Do all hoses with any pressure have Whip Checks?
-
Are all tank openings Bull Plugged or Blind Flanged?
-
Are all hoses Factory made?
-
There are no visible drips on effluent or overflow lines, correct?
-
Is Fall Protection device in place where needed?
-
Is harness & lanyard readily available?
-
Is excavator being inspected for damages and documented prior to each tour?
Electrical
-
Is the Active Centrifuge grounded?
-
Is effluent tank grounded?
-
Are the VFD Panel doors secured, air & water tight?
-
Is the Polishing Centrifuge grounded?
-
Is the Polishing Centrifuge Pump grounded?
-
Is the Polishing Centrifuge Stand grounded?
-
Is the Active Centrifuge Stand grounded?
-
Do all electrical panels have "High Voltage" stickers?
-
Is the Active Centrifuge Pump grounded?
-
Electrical plugs to panels have no wire showing, correct?
-
Are all electrical panels grounded?
-
Are all electrical caps secured on all unused outlets?
-
Are all electrical plugs plugged in properly and securely?
-
Do Shaker stop / start panels have all bolts secured?
-
Are all electrical lines tied off with black zip ties or cable?
-
Do all ground rods have impalement caps?
-
Are Drying Shakers grounded?
-
Is there sufficient lighting in the backyard?
House Keeping
-
Is office & equipment clean and in order?
-
Is living quarters clean and in order?