Title Page

  • Conducted on

  • Prepared by

  • Company Details

  • Client order number

Pre-Commissioning Checks

  • Confirm the system is operational before commencing

Installation Information

  • When was the system installed

  • How many heads are in the system

  • Have all heads been visually inspected

  • Defects Found

  • Is the audible alarm operational

  • Location of audible alarm

  • Waterflow rate recorded through flow meter is

  • System requires

  • Was the test satisfactory

Checklist

  • Heads

  • Cover plate

  • Sprinkler Valve

  • Flow Switch

  • Alarm

  • Pipework

  • Signature

  • Comments

Receipt of Service

I acknowledge receipt of this service and commissioning report

  • Recipients Name

  • Recipients Signature

  • Date

Technicians Details

  • Technicians Name

  • Technicians Signature

  • Date & Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.