Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Testing of Detectors
-
Have all Smoke Detectors in the installation been tested with BCA requirements?
-
How many Smoke Detectors were tested?
- One
- Two
- Three
- Four
- Five
- Six
- Seven
- Eight
- Nine
- Ten
-
Have all detectors that were tested passed the operational test procedures?
-
How many Smoke Detectors failed the compliance test?
- None, all passed
- One
- Two
- Three
- Four
- Five
- Six
- Seven
- Eight
- Nine
- Ten
-
Have all Smoke Detectors that failed the tests been replaced?
-
Is any further action required to meet compliance of this installation?
Next test due date
-
Your next test is due on:
Compliance Statement
-
Further to the installation of smoke detectors at the listed address above, this compliance certificate is to confirm the installation of smoke detectors and state their installation and operational compliance with AS 3786-1993 and clause 3.7.2.3 of BCA and that they have been hard wired to the electrical system in accordance with the above standards.
Signed off by
-
Signed by Platinum Electrical Contractors Representative