Title Page
-
Conducted on
-
Park Homeowner Name
-
Prepared by
- Robin Martin
- Sam Harbour
- Charlie Crowhurst
- Eve Mockevicious
- Nick Dowling
- David Dowling
- Stuart Miller
-
Location
-
Property Type
-
Number of Bedrooms
- 1
- 2
- 3
- 4
- 5
- 6
-
Fuel Type
On-Site Survey
-
Colour Code
- OC80
- CG56
- WHITE
- GR71
- Other- Specify in Notes
- Client to decide at a later date
-
Construction of Park Home Skin?
- Plywood
- Aluminum
- Wood
- uPVC Therefore remove
-
Do any of the walls require plywood change?
- YES
- NO
-
How Many SQM require changing?
-
Height of Park Home Drip Rail (drip rail to Soffit)
- 1.0m
- 1.5m
- 2.0m
- 2.5m
- 3.0m
-
Width
- 8m
- 9m
- 10m
- 11m
- 12m
- 13m
- 14m
- 15m
- 16m
- Other - Specify in Notes
-
Length
- 8m
- 9m
- 10m
- 11m
- 12m
- 13m
- 14m
- 15m
- 16m
- Other - Specify in Notes
-
Is there a Porch
- YES
- NO
-
Is the Porch to be included in the install?
- YES
- NO
-
Soffit over 100mm Long ends
- YES
- NO (VT)
-
Soffit over 100mm Short ends
- YES
- NO (VT)
-
Once drip rail has been removed will there ba a gap from P/H to top of skirt? (leave comments in notes)
- YES
- NO
- N/A
-
Any areas mesh & render only
- Bay Canopies
- Under Bay Windows
- Apex`s
- Long End Soffits
- Apex Soffits
-
Chamfer Insulation (Comment in notes)
- Doors
- Bay Windows
Obstruction to insulation and how to deal with them
-
Telephone wire
-
Wiring - Trunk or Bury ?
- Trunk
- Bury
-
Electric box in use or Empty?
- In use
- Empty
-
Gate/Fence post adjustment (leave comments in notes)
- Adjust
- Work around
-
Brick work (leave comments in notes)
- Cutback
- Box around with 5mm clearance
-
Decking (leave comments in notes)
- Adjust
- Box with 5mm clearance
-
LPG Regulator and pipes
- Extend
- Room to work Behind
- N/A
-
TV/Sky
- Bring out on Baton
- N/A
-
External Water Tap?
-
External Electric Socket ?
Protrusions
-
SVP
-
Boiler Flue
-
What is the Length of the existing Boiler flue ? (please add pictures)
-
What is the make and model of the existing boiler ? (please add pictures)
-
PRV
Extra Work
-
Refit Mock Tudor
- YES
- NO
- N/A
-
Refit Corner Quoins
- YES
- NO
- N/A
-
Extra comments regarding the job
Permissions
-
Permission to Work Required
- YES
- NO
-
Wo owns the Park Home?
-
P.T.W Required
Drawn Plans
-
Please Take Pictures of the drawn site survey and floor plans
Ventilation Strategy
-
Does the Property have adequate Combustion Ventilation in place?
-
Please State the reason for the Additional Ventilation in the notes and select the location of the required Combustion Ventilation.
- Living Room
- Living Room 2
- Dining Room
- Kitchen
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Utility Room
- Kitchen
- Bathroom
- Bathroom 2
- En-Suite Bathroom
-
Does the Property have Adequate Mechanical Extraction and ventilation already in place in all wet rooms ?
-
Mechanical Extraction Ventilation Strategy
- Install a Mechanical Ventilation Extraction unit in the Kitchen 60 L/s
- Install a Mechanical Ventilation Extraction unit in the Bathroom 15L/s
- Install a Mechanical Ventilation Extraction unit in Bathroom 2 15L/s
- Install a Mechanical Ventilation Extraction unit in the En-Suite Bathroom 15L/s
- Install a Mechanical Ventilation Extraction unit in the WC 15 L/s
- Install a Mechanical Ventilation Extraction unit in the Utility Room 15 L/s
- The property is well ventilated and does not require further moisture control or ventilation.
-
Does the Property have adequate background ventilation by means of window trickle ventilation or other room ventilation in habitable and wet rooms?
-
Back ground Ventilation Strategy
- Install Trickle ventilation to the window of Habitable Room 1
- Install Trickle ventilation to the window of Habitable Room 2
- Install Trickle ventilation to the window of Habitable Room 3
- Install Trickle ventilation to the window of Habitable Room 4
- Install Trickle ventilation to the window of Habitable Room 5
- Install Trickle ventilation to the window of Habitable Room 6
- Install Trickle ventilation to the window of Habitable Room 7
- Install Trickle ventilation to the window of Habitable Room 8
-
Does the Property have adequate background ventilation by means of Door undercuts of at least 7 600 mm2 beneath all internal doors, above the floor finish, to allow air to move through the dwelling in habitable rooms? ( approx 7-10mm gap)
-
Door Undercut Ventilation Strategy
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 1
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 2
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 3
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 3
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 4
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 5
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 6
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 7
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 8
- Plane the door on the lower edge to create a door undercut of 7-10mm in Habitable Room 9
- Plane the door on the lower edge to create a door undercut of 7-10mm in Wet Room 1
- Plane the door on the lower edge to create a door undercut of 7-10mm in Wet Room 2
- Plane the door on the lower edge to create a door undercut of 7-10mm in Wet Room 3
- Plane the door on the lower edge to create a door undercut of 7-10mm in Wet Room 4