Title Page

  • Site conducted

  • Stay calm and ensure your own safety

  • Call 9-1-1 if needed

  • What is the emergency?

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house (unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • Go to control room to get electronic road flares and create bread crumb trail at each intersection from plant entrance to site of emergency.

  • During plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to flagpole to guide emergency response personnel.

  • During plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Lane, Pleasant Gap, PA 16823

  • During plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging Operator will secure the site at the Airport Road gate. They will drive a truck to the gate and restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Lane, Pleasant Gap, PA 16823

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own timecards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors is any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • Go to control room to get electronic road flares and create bread crumb trail at each intersection from plant entrance to site of emergency

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to flagpole to guide emergency response personnel.

  • During plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • What is the weather event?

  • What is your position?

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • IF you are indoor stay there. Get under a desk or table and hang on to it or move into a hallway or against an inside wall. Stay clear of windows and heavy furniture or equipment. DON'T run downstairs or rush outside while the building is shaking or while there is danger of falling and hurting yourself or being hit by falling glass or debris.

  • If you are OUTSIDE -- get into the OPEN, away from buildings, power lines, stockpiles, highwalls and anything else that might fall on you.

  • If you are DRIVING -- stop, but carefully. Move your vehicle as far out of traffic as possible. DO NOT stop under trees, light posts, power lines, signs or near/on stock piles or highwalls. STAY INSIDE your car until the shaking stops.

  • When you RESUME driving, watch for breaks in the pavement, fallen rocks, and bumps in the road. Evacuation will occur after earthquake is over to account for employees. After evacuating, employee will be kept at the change house meeting point and mine office parking lot until it is determined that it is safe to access the plant and mine, or until they can be safely released from the site. The plant will be assessed for damage to water, gas, and electric lines.

  • What is your position?

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Med Emer K8 Att 3

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Med Emer kiln op 3

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • What is your position?

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant winds until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • Stay away from power lines, highwalls, stockpiles and embankments that may be affected. Employees on the surface will use the cooler pit to shelter-in place in the event of significant tornado event until it is determined that it is safe to access the plant, or until they can be safely released from the site.

  • What is your position?

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • Keep personnel and equipment out of possible flash flood areas, floodplains and flood prone areas and strategically position dike/dam materials and sump pumps.

  • What is your position?

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Fire K8 Att 1

  • Fire K8 Att 2

  • Fire K8 Att 3

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • Quickly determine the most reasonable way to protect your own life.

  • Analyze your Run, Hide, or Fight Options

  • Dial 911 when you are in a safe place

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Fire BPL 1

  • Fire BPL 2

  • Fire BPL 3

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to Flagpole to guide emergency response personnel.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a truck loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • Go to control room to get electronic road flares and create bread crumb trail at each intersection from plant entrance to site of emergency

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to Flagpole to guide emergency response personnel.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Lane, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a truck loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • Go to control room to get electronic road flares and create bread crumb trail at each intersection from plant entrance to site of emergency

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to Flagpole to guide emergency response personnel.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a truck loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • Go to control room to get electronic road flares and create bread crumb trail at each intersection from plant entrance to site of emergency

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to Flagpole to guide emergency response personnel.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a truck loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • Go to control room to get electronic road flares and create bread crumb trail at each intersection from plant entrance to site of emergency

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to Flagpole to guide emergency response personnel.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a truck loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • Go to control room to get electronic road flares and create bread crumb trail at each intersection from plant entrance to site of emergency

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • Go to Flagpole to guide emergency response personnel.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a truck loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • What is your position?

  • In the event of a plant evacuation, Kiln Helper will report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • In the event of a plant evacuation, Bulk Pebble Loader will support Kiln Helper and report to the clock house. (Unless the clock house is involved in the emergency)

  • Ensure all employees report to the clock house and collect their own time cards. This is the method for accounting of all hourly employees.

  • Interact with Supervisors if any hourly employees are not accounted for.

  • Act as resource for emergency response professionals.

  • Coordinate plant resources to support them.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • Make initial calls to emergency response agencies (fire, EMS, spill response, etc.)

  • Direct employees to required positions as descried in the operators check list

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The loader operator will secure the site. They will drive a loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • During Plant evacuations, grab timecard and wait at time clock area for further instructions.

  • Follow instructions to assist where needed.

  • The Bagging operator will secure the site at the Airport Road gate. They will drive a truck loader to the gate, restrict access to plant personnel, family members, emergency response, and state and federal regulators.

  • Direct all media to the Pleasant Gap Fire Dept. 475 Robinson Ln, Pleasant Gap, PA 16823

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.