Title Page
-
Time
-
Supervisor
-
Contractor
-
Crew Members
-
Conducted on
-
Prepared by
-
Location
-
Is Temporary Traffic Management Required? (If yes is selected, please carry out TTM Audit)
Pre-Work Paperwork
-
Description of work (at time of inspection):
-
Does the operative have the correct site safety folder with all required contents available?
-
Has the Safe Plan of Action been filled in corrrectly and signed by all?
-
Has the relevent Permit been issued and has the operative it on site?
-
Has the operative access to method statements & emergency numbers?
-
Does the operatives know what to do in the event of an emergency?
-
Has the operative contacted the local CSS prior to starting work?
Competency
-
Have the operatives been inducted on the project?
-
Have the operatives been briefed and signed off on the method statement for<br>the Survey and Accessing a PL Column door work which is being carried out?
-
Has a minimum of one operative completed the Opening a PL column door<br>training?
-
Is the operative a Qualifed Electrician?
PPE / Equipment
-
Is the correct Insulated Tools dielectric rubber mat available for the task?
-
Is there a Phase Check availabe and is it in good order?
-
Does the vehicle have a first aid kit and Fire Extinguisher available?
-
Does the Operative have standard PPE available and is it being worn?
-
Does the operative have the correct Arc PPE and is it for for purpose?
Work Process
-
Has the operative parked correctly at the work location?
-
Has the operative set up a safe work area around the PL column or LA Pillar?
-
Has the electrian assesed the PL or LA pillar using the Phase check?
-
Is the G.O aware of the dangers of accessing a live source and is he standing a<br>safe distance away while the PL or LA door is being removed?
-
Is the electrican using the corrected insulated tools?
-
Has the operative removed the PL column or LA pillar door correctly applying<br>safe practice?
-
Has the operative completed the visual survey without risk?
-
Once the visual survey was complete did the operative reattcahed the PL or LA<br>pillar door safely?
-
Has housekeeping been maintained throughout the work process?
Live Works Checklist
-
Is the PICW identified and present on site?
-
Are all persons working on site approved PL Opening Column Doors
-
Is the full range of approved PPE in use and in good condition? Helmet with full face visor, High Vis Vest, Rubber-soled Safety Boots, Arc Protective Overalls?
-
Is the full face visor fully engaged and upper body fully covered when making/breaking connections or where there may be danger of flashover?
-
Do the approved insulated protective overalls carry the “double triangle” 1000V stamp?
-
Are the Gloves checked before use? a) Stretched and b) Close-up Air Test
-
Are approved Live Work Tools and Equipment stored separately from other general tools etc.?
-
Are the live work tools and equipment in good condition? e.g. not soiled etc.
-
Has the contractor received permission from ESB to energise the PL switchwire?
Hammer Test
-
Is area clear to do hammer test?
-
Access the pole for any cables before hammer test?
-
If cables are identified, is test been carried out on side of pole without cables?
-
Is safety glasses/ visor worn at time of hammer test?
-
Is G/O stopping any pedestrians while the hammer test is been carried out?
-
If pole is defective, has it been recorded?
-
Is house keeping been maintained after hammer test is carried out?
Working at height
-
Hoist in use?
Hoist Parking & Set-Up
-
-
Are appropriate traffic management controls (signage, cones, barriers) and CSCS approved persons in place?
-
Are all hazard warning lights & flashing beacons working and in use?
-
Are all host operatives fully qualified?
-
Are vehicle jacks fully extended on all sides and deployed on level surface with pressure pads, where required?
-
Is vehicle correctly positioned for incline with front wheels angled into kerb, wheel chocks deployed and handbrake fully engaged?
-
Inspect copy of Manufacturer’s Certification of vehicle for Class C operation ( 46kV) and cross check with vehicle name plate
-
Is fully body harness with fall-arrest attachment in use and attached to bucket anchor point?
-