Plantroom Operation
-
Compressor set 1 running conditions
-
Compressor set 2 running conditions
-
Compressor set 3 running conditions
-
PHE operating conditions
-
IP within operating range
-
HP within operating range
-
Add media
-
Recommendations or issues
Vessels
-
Liquid receiver operating conditions
-
Liquid receiver level satisfied
-
Valves and vessel condition are within operation conditions
-
IP vessel operating conditions
-
IP level maintained within control ranges
-
IP fill valves operating correctly
-
Add media
-
Recommendations or issues
Condensors
-
Condensor 1 running conditions
-
Condensor 2 running conditions
-
Condensor fans operating correctly
-
Condensor water pumps operating correctly
-
Add media
-
Recommendations or issues
Glycol System
-
Glycol pump 1 running conditions
-
Glycol pump 2 running conditions
-
Glycol pressure being maintained within operating limits
-
Glycol supply temperature maintained within operating limits
-
Add media
-
Recommendations or issues
Electrical & Controls
-
PLC controls and switch gear operation
-
Control and set points being reached
-
Visual inspection of switch gear and cables are fine
-
Control room temperature at suitable level
-
Add media
-
Recommendations or issues
Room 1
-
Room 1 running conditions
-
Glycol 3-way valve operating correctly
-
Room temperature achieving correct setpoint
-
Fans operating correctly
-
Coil and drain conditions satisfactory
-
Defrost operating correctly
-
Add media
-
Recommendations or issues
Room 2
-
Room 2 running conditions
-
Glycol 3-way valve operating correctly
-
Room temperature achieving correct setpoint
-
Fans operating correctly
-
Coil and drain conditions satisfactory
-
Defrost operating correctly
-
Add media
-
Recommendations or issues
Room 3
-
Room 3 running conditions
-
Glycol 3-way valve operating correctly
-
Room temperature achieving correct setpoint
-
Fans operating correctly
-
Coil and drain conditions satisfactory
-
Defrost operating correctly
-
Add media
-
Recommendations or issues
Room 4
-
Room 4 running conditions
-
Glycol 3-way valve operating correctly
-
Room temperature achieving correct setpoint
-
Fans operating correctly
-
Coil and drain conditions satisfactory
-
Defrost operating correctly
-
Add media
-
Recommendations or issues
General Site Health & Safety / Miscellaneous
-
Recommendations or issues
-
Add media
-
Technician's signature