Information
-
Audit Title
-
Prepared by
-
Location
Routine Visual Inspection Checklist
Daily Inspection Instruction
-
Approved on-site personnel are to complete daily inspection of the trestle at the beginning of every day shift. If any item is non-compliant, a copy of the checklist must be sent to KECo for review. File the completed checklist in the permanent record.
-
Weather
Rail
-
Handrail free of damage
-
Guardrail free of damage
Decking
-
Clear of ice, snow, mud, dirt, and debris.
-
Overlay free of damage & major wear.
Approaches
-
No erosion / rock slope maintained.
-
Free of potholes.
Concrete Abutment
-
No movement
-
Free of cracking and spalling
Piers
-
No ice build-up
-
No evidence of impact or damage
-
X-Bracing / Turnbuckles Connected
Trestle Performance
-
No change in ride performance
-
No change in deck deflections under load
-
No change in pier deflections under load
-
No chance in noticeable vibrations
Spillway pool and shelf
-
Water level ok
-
Ice condition good
-
No evidence of ice block / sheet movement
-
No discharge of ice through spillway gates
Inspector
-
Signature
-
Select date