Information
-
Pre-notification Reference (DDMMYYYY - Site)
-
Document No.
-
Client
-
Conducted on
-
Prepared by
Section A - Description
-
Site
- Narrakine
- Wandering
- North Williams
- Other
- Narrogin
- Williams
-
If Other:
-
Description of work.
-
Description of ground conditions where works are to be carried out.
- Bare
- Grassy
- Bitumen
- Concrete
- Gravel
-
Start time
-
Estimated finish time
Section B - Weather Conditions (2 reds, do not complete works)
-
Weather Risk Assessment
-
Is there a machinery movement ban in the shire. If yes do not complete works.
-
Temperature
- Hot 30+ deg
- Mild 20 to 30 deg
- Cool <20 deg
-
Wind Levels
- Windy >15km
- Mild <15km
- Still
-
Are there flammable materials within 10m
Section C - Machinery Protection
-
Machinery has been isolated and danger tags attached to main isolator.
-
Surrounding equipment has been isolated and airborne dust allowed to settle.
-
Any spouts or floor openings in the vicinity have been blocked to prevent hot materials falling through.
-
Has a suitable fire blanket been placed over any susceptible machinery.
-
If cutting in to an elevator or chute are the elevator buckets empty and the inside surfaces washed down.
Section D - Preventing fire ignition and escape
-
What suitable fire fighting equipment is present
- Fire fighting unit
- Fire extinguisher
- Water bucket
- Water hose
-
Has someone been designated to stand as fire watch. This, CBH inducted, person will be on watch for accidental combustion.
-
Who from CBH Operations has been notified of the issue of this permit?
-
Company performing works?
-
Spotter
-
Pre-notification issued by