Audit
One month review
Full growing season review
Is crossing stabilized?
Has grading been restored to pre-construction conditions
Were trench plugs installed as per the permitted drawings?
Has excess fill material been removed?
Have erosion and sedimentation controls been removed?
Have the permitted plantings been completed?
What is the current overall condition of plantings(hydrophytic vegetation)
Additional observations or comments
Inspector signature
Add media