Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Site Signs Installed<br><br>Note: Builders Sign, Safety Sign and Do Not Enter Sign
-
Temporary Fencing installed<br><br>Note: Gate Padlock installed
-
Site Toilet on site
-
Safety Plan on site
-
Water on site
-
Slab completed
-
Overhead Power<br><br>Note: Temporary pole Installed
-
Telstra Lead completed
-
Soil Removal<br><br>Note: if soil is in the way, soil to be removed. Check with Contract Administrator prior to moving soil<br><br>Not: Red Soil to have deco spread around house
-
Termimesh penetrations Installed<br><br>Note: Check retaining walls, plumbing and electrical conduits
-
Surveyor Points installed<br><br>Note: Check footings and slab
-
Boundary Pegs Installed
-
Check plumbing<br><br>Note: Check Gully pits are installed
-
Pool on Site<br><br>Note: Pool Protection or Temporary pool fencing installed
-
Claymore Stage 2 completed<br><br>Note: check sediment control, bin cage assembled, gravel installed in driveway. Road clean
Access Problems
-
Traffic Control required for Deliveries <br><br>
-
Check Access for Frame Delivery<br><br>Note: Special Crane might need to be booked if special access is needed
-
Check Access for Bricks
-
Check Access for Water Tank
-
Zero Lot Problems<br><br>Note: Send standard letter to Neighbor in regards to removing fence
Damage
-
Damage to Footpath, Kerb and Road
-
Damage to Neighbor Fences
Additional Comments
SIGN OFF
-
On Site Representative