Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
NUMBER OF DIFFERENT PAINT BATCHES
-
CUPPING TEST PERFORMED FOR ALL BATCHES
-
BEND TEST PERFORMED FOR EVERY BATCH
-
IMPACT TEST PERFORMED FOR EVERY BATCH
-
AVERAGE COATING THICKNESS
-
CROSS HATCH AND BOIL TEST FOR EVERY BATCH
-
SAW/MILL/DRILL TEST PERFORMED FOR EVERY BATCH
-
APPERANCE CHECKED ON EVERY PIECE PAINTED
-
AVERAGE GLOSS READING FOR EVERY BATCH
-
DRYING TEMPERATURE- DATA PAQ PERFORMED WEEKLY
-
BATH TEMPERATURE CHECKED AND WITHIN TOLERANCE
-
STOVING CONDITIONS RECORDED DAILY
-
CHEMICAL PARAMETERS WITHIN MANUFACTURER SPECS
-
ETCH RATE PERFORMED DAILY AND WITHIN SPEC
-
COATING WEIGHT CHECKED AND WITHIN SPEC
-
CONDUCTIVITY OF BATHS WITHIN SPEC
-
BOOTH 1 TEMP AND HUMIDITY
-
BOOTH 2 TEMP AND HUMIDITY
-
PAINT BOOTHS CLEAN AND FREE OF DEBRIS AND DUST
-
PAINT STORED IN CLIMATE CONTROLED STORAGE UNIT
-
POWDER KITCHEN CLEANED AND FREE OF CONTAMINATION
-
PAINT NOZZELS CLEANED AFTER EVERY COLOR
-
SONIC WASH CHEMICAL LEVEL WITHIN TOLLERANCE
-
HOOKS ARE CLEAN AFTER SONIC WASH
-
OFFLINE COLOR CHIPS BEING USED
-
ALL CRADELS FULLY FELTED
-
VERTICLE AND HORIZONTAL SPACER BARS FELTED AND FREE OF DEBRIS