Title Page

  • Powell River Energy- Powell Fence inspection checklist

  • Conducted on

Fence inspection Checklist

East side of Powell Dam

  • Fence Post and extension arms straigt and secure?

  • Gates, gate mechanisms and gate locks intact and operational

  • Chain link fence in good condition and tightly secured?

  • Barbed wire in good condition and tightly secured?

  • Fence galvanizing in good condition?

  • Grounding wires and attachments (were fitted) in place and secure?

  • Electrical isolation section in tact and secure?

Powell Power Canal Upstream of Dam

  • Fence Post and Extension arms straight and secure?

  • Gates, gate mechanisisms and gate locks intact and operational

  • Chain link fence in good condition and tightly secured?

  • Barbed wire in good condition and tightly secured?

  • Fence galvanizing in good condition?

  • Grounding wires and attachements (Were fitted) in place and secure?

  • Electrical isolation section intact and secure?

  • Fence Post and Extension arms straight and secure?

  • Gates, gate mechanisms and gate locks intact and operational

  • Chain link fence in good condition and tightly secured?

  • Barbed wire in good condition and tightly secured?

  • Fence galvanizing in good condition?

  • Grounding wires and attachments (Were fitted) in place and secure?

  • Electrical isolation section intact and secure?

  • Add signature

Sign Inspection Checklist

P-01 Wildwood Bridge Sign

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-02 Powell Vehicle Access Gate

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-03 Trail to power canal

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-04 Power canal beach

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-05 Power canal beach entrance @ substation

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-06 Dam Man Gate

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-07 Dam Walkway

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-08 Forebay Storage Shed

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-09 Hoist House

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-10 Dam Floodwall

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-11 Upsteam Fence

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-12 Dam Walkway

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-06 Dam Man Gate

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-03 Trail to power canal

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

P-02 Powell Vehicle Access Gate

  • Cleanliness of sign face

  • Weathering of sign face

  • no physical damage to sign and/or supports

  • Weathering of Sign or supports

  • Sign Bolts or anchorage tight?

  • Sign Support posts straight and secure

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.