Title Page
-
IATF 16949:2016 Audit - PPAP Submission
-
Address
-
Part Name, Number & Customer
-
Prepared by
-
Conducted on
PPAP Documents Checklist
PPAP Documents
-
Design records
-
Approved engineering change documents
-
Customer engineering approval
-
Process flow diagrams
-
Process FMEA
-
Control plan
-
Measurable system analysis studies
-
Dimensional analysis
-
Performance and material test results
-
Initial process studies
-
Qualified laboratory documentation
-
Appearance approval report
-
Sample production parts
-
Master sample
-
Checking aids
-
Customer specific requirements
-
Part submission warrant
PPAP Submission Assessment
-
Is there clear and proper detail provided on “Reason for Submission”?
-
Is there evidence of prior agreement for submission requirements?
-
Are all documents controlled?
-
Are all submission subcomponents/processes included?
-
Is the submission according to PPAP 4th edition requirements?
-
Was the PPAP submitted on time?
Completion
-
Additional Comments
-
Name & Signature of Person Responsible