Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
This Document is designed as a quality Inspection tool and all fields are to be filled out and documented along with detailed notes and photos of all required criteria .
Please note a site diary is to be completed listing all defects and works broken and a individual Test Plan for Each stage of the works is required .
This document is to be completed for all live works -
Job Number
-
Supervisor
-
Roof Stage
-
Select date
-
Add location
-
Roof Stage Photo Prior To Removal /Installation
-
Have you arranged inspection with the client to go through scope and process of work as per their exspectations
-
Comments
Site Measure
-
Is the building electrical feed impeding the works
-
Electrical or Tv aerial photos ,whirly birds ,penetrations
-
Is there any structural damage ,or loose fixings i.e.:purlins/battens
-
Have you checked roof for structural integrity prior to accessing
-
Have you completed a precise mud map for employees or subcontractors
-
Have you measured all flashings
-
Are Electrical isolations required
-
have you measured all gutters,sumps,rainheads
-
Have you measured all Syphonics fittings and allowed for all clips and fixings
-
Have you allowed for insulation ,firewalls etc
-
Have you allowed for correct fixings and are they on site
Tooling
-
Is all tooling on site for the works
-
Is all tooling in current tag
Materials
-
Have all materials for stage been ordered
-
Have all materials delivered been checked off against purchase orders
-
Do you require additional materials or is there anything missing required
-
Materials if required
-
Are any materials damaged
-
Materials damaged
Roof Height - Site Setup
-
Who is completing the Stage employee list
-
Is All Safety Management Documents and Required paperwork completed
-
Has Hand Rail Been Installed Correctly and areas contained
-
Is The Handrail Secured with strapping as an additional safe guard
-
Have Kick Boards been Fabricated and placed on active area
-
Take Photos of completed installed Hand Rail
-
Are Hydration Stations setup
-
Take photo Of Hydration Photo setup
-
Have you the required tarps on site in case of rain
-
Are Toolboxes and Builders Power Boards Setup and Strapped Down
-
Take Photo
-
Is SIgnage ,Bunting In Place
-
Take Photo
-
Is all New Roofing Materials secured on roof with Strapping
-
Have staff all the required PPE& TOOLING
-
Has The Roof been Prepped i.e. Screws removed 60% Prior To Work Start For The Stage
-
Take Photo
-
Have you setup a exclusion area
-
Take Photo
-
Has a supervisor inspected the completed area
-
Supervisor Sign Off That the area is safe and prepped
-
Site Completed Prepped area photos
Anchor Point Inspections
-
Are anchor Points required for accessing roof areas
-
Are anchor points installed correctly
-
Supervisor Verification of Correct Installation
Roof Removal
-
Have you taken a photo prior to removal
-
What is the overall m2 of the building that requires roof replacement
-
Have you set production targets for the day
-
What targets have you set in m2 for the day
-
Have all old gutters been removed for the stage
-
Has Roof area been prepped for removal i.e.: screws removed /flashings
-
Will there be a open void when removing roof with no safety wire underneath
-
Do the workers require a harness for removal
-
Has any structural issues been identified during removal i.e.: battens,tie downs,purlins ,rafter spacings other structural issues
-
Structural Issues
-
Take Photos of structural issues
-
Has all old sheeting been secured with strapping on the roof area
-
Supervisors Verification that Roof sheeting has Been secured
Roof Installation
-
Have you given targets for roof installation
-
M2 targets for each day
-
Roof Installation Team Names
Safety Mesh
-
Has Safety Mesh Been Installed as per Manufactures Recommendations
-
Hold Point - Inspecting Supervisors name
-
Defects found on inspection
-
Defects Photos if Applicable
-
Rectification Notes
-
Completed Rectification Photos
-
Completed Overall Photo -Safety Mesh -Photo of Install
-
Supervisor Verification of Install
-
Rio Tinto Supervisor Verification if applicable
Insulation
-
Has Insulation been installed to manufacturers specification <br>
-
Hold Point -Inspecting Supervisors Name
-
Defects ound on inspection
-
Defect Photos if applicable
-
Rectification notes
-
Completed Rectification photos if applicable
-
PRC Supervisors Verification signature
-
Rio Tinto Supervisor Verification if applicable
Roofing Active Install
-
Has Roofing Been Installed To Manufacturers specifications
-
Take photo
-
Has the Roofing Sheets been overlapped as per manufactures specifications
-
Take Photos
-
Take Photos
-
Has a chalk line been used to ensure parallel screw lines <br>
-
Has roof sheeting been turned up at ends
-
Take Photos
-
Are the screw lines straight
-
Take Photos
-
Are the Class 4 Screws Correctly Installed without over tightening or over compression of cyclonic washers
-
Take Photos
-
Hold Point - Supervisors Name of overall Verification of Roof Install
-
Defects If Applicable
-
Defect Photos
-
Photos of completed defects
-
Take Photo of Completed Roof Area and Project
-
PRC Supervisors Verification Signature
-
Rio Tinto Supervisors Verification Signature
Flashings
-
Have flashings been installed to manufacturers recommendation
-
Are the Flashings undersealed
-
Are correct overlaps in Place
-
Have Correct Fixings been applied
-
Have Rivets been sealed
-
Photos of Flashings Completed -Please Note all Flashings for Stage must be photographed .
-
Hold Point - PRC Supervisors Name
-
Defects Identified if applicable
-
Defect Photo
-
Rectification Notes
-
Completed Rectification Photos
-
PRC Supervisor Verification
-
Rio Tinto Supervisor Verification
Box Gutter
-
Have the box gutter brackets been installed at .5 m intervals
-
Hold Point - PRC Supervisor to Inspect
-
PRC Supervisor Verification
-
Box gutter Bracket Photos
-
Has the Box Gutter Been Installed To Current Specification
-
Hold Point - PRC /Rio Supervisors To Inspect
-
Defects if applicable
-
Defect Photos
-
Rectification Notes
-
Completed Defects Photos
-
Have any joins been correctly undersealed /installed and expansion joints installed
-
Have all Syphonic fittings been correctly installed to manufacturers specifications
-
Have all fittings including all pipework been re-installed with correct falls
-
Hold Point -PRC -Rio Tinto supervisor Inspection
-
Defects If applicable
-
Defect Photos
-
Remediation Notes
-
Completion Photos
-
PRC Supervisor verification
-
Rio Tinto Verification
Ridge Vent
-
Has The Framing Been Installed as per manufacturers Specifications
-
Hold Point -PRC /Rio Tinto Supervisor to Inspect
-
Defects if applicable
-
Defect photos
-
Remediation Notes
-
Completed Framing Photos
-
PRC Supervisor Verification
-
Rio Tinto Verification
-
Has the Ridge Vent Cladding and Flashings been installed as per manufacturers specification
-
Defects If applicable
-
Defect Photos
-
Remediation Notes
-
Completed Ridge Vent Photos
-
Was the project a success in your opinion as far as OH&S and Financial
-
PRC Supervisor signature
-
Rio Tinto Supervisor Verification Signature
Additional Notes If Required
-
Are there any areas where process or procedures could improve the quality or timing
-
Additional Overall Photos please take from different angles of the completed overall works