Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 AUDIT - INFORMATION
-
Is this audit for Pre-Acceptance of Works (AoW) or Pre-End Defect Liability Period (EDLP)
-
Is this audit for Sewer, Water or Recycled Water
-
Watsons Reference:
-
Retail Water Authority
-
Retail Water Authority Reference:
-
Contractor
-
Is contractors representative present for this audit
-
Q number for live entry (if required)
-
Permit/Access number supplied by MRWA control room for CSE (if required)
2.0 AUDIT - NON-CONFORMING ITEMS C (Conforming) NC (Non Conforming) O (Observation If there are 15 or more NC items abandon audit
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
3.0 ALL NON-CONFORMANCES RECTIFIED
-
Date all items rectified
-
AoW or EDLP verification: