Title Page
-
SUPERVISOR'S NAME
- R. ALMACK
- J. FALGOUT
- T. MOORE
- P. PORTER
- B. ROEDER
- R. SMALL
- OTHER
-
NAME:
-
CUSTOMER JOB NUMBER:
-
SEPCO JOB NUMBER:
-
CONDUCTED ON
-
LOCATION
-
STRUCTURE NUMBER:
PRE-DIG QUESTIONAIRE
DIG TICKET & STRUCTURE INFO
-
DIG TICKET NUMBER:
-
TICKET EXPIRATION DATE:
-
IS CROWN CASTLE LISTED ON POSITIVE RESPONSE TICKET
-
CALL CROWN CASTLE AND SCHEDULE ONSITE VISIT - Eric Erving
Construction Inspector
T: (561) 337-4869 M: (954) 773-5540
UNDERGROUND UTILITIES RESPONDED TO DIG TICKET:
-
ALL UNDERGROUND. UTILITIES RESPONDED AS ALL CLEAR (if yes attach picture of dig ticket)
-
STOP - SEE BELOW AND REFERENCE RESPONES FROM USIC
Marked
1 Marked: A locate technician has been to your excavation site and marked the approximate horizontal location of underground facilities within the boundaries described on the ticket.
2A Marked with Exceptions: High profile utility in conflict; utility owner will attempt to contact you to schedule site surveillance.
An underground facility that delivers services to a large number of people or that could cause major problems if hit (i.e. fiber optic line, gas line, etc.) is within your excavation site. While the locate technician has marked the approximate horizontal location of the facility, the utility or its locate technician want to be present during any excavation near that facility. The utility will attempt to contact the excavator to determine when excavation will take place.
2B Marked with Exceptions: Privately owned facilities on property; contact private facility owner directly – A utility or its locate technician has located and marked its underground facility, but other facilities of that same type are in the area and were not marked because the utility claims no responsibility for locating them. This happens most often with customer-owned service lines.
2C Marked with Exceptions: High-priority subsurface installation in conflict. Excavator MUST notify the member of the excavation or demolition start date and time.
The high-priority subsurface installation designation is for use by only those members that have underground transmission or distribution pipelines used to transport any gas, refined petroleum product or hazardous/highly volatile liquid such as anhydrous ammonia or carbon dioxide, if the facility is deemed to be critical by the operator of the pipeline and is identified as a high priority subsurface installation.
2D Marked with Exceptions: High profile utility in conflict. An underground facility that delivers service to a large number of people or that could cause major problems, if hit, is within your excavation site. Contact the utility if you want more information.
2E Marked with Exceptions: Marked within the confines of the white-lined area.
A locate technician marked the approximate horizontal location of buried facilities WITHIN the white-lined area. (White paint, stakes or other white marks define the dig site boundary.) Any excavation outside the white-lined area requires a new ticket.
Unmarked
3A Unmarked: Locate technician could not gain access to property; call utility to schedule access.
Excavation site is unmarked. A utility’s locate technician was sent to the excavation site, but was unable to access the area to be marked due to a locked gate, blocked entrance, guard dog or other circumstance prohibiting entry. Call the utility to re-schedule a time when the entrance will be open.
3B Unmarked: Incorrect address information. Call Sunshine 811 to verify the information on the ticket.
Excavation site is unmarked because the address could not be found. Please call 811 or (800) 432-4770 to verify the address information and make adjustments to the ticket as necessary.
3C Unmarked: Locate technician and contractor (excavator) have agreed to meet on site on a specified date.
Excavation site is unmarked. The locate technician and excavator negotiated an alternate time to meet at the excavation site.
3D Unmarked: High profile utility in conflict; utility owner will attempt to contact you to schedule site surveillance.
Excavation site is unmarked. An underground facility that delivers services to a large number of people or that could cause major problems if hit (i.e. fiber optic, gas or electric line, etc.) is located near your excavation site. The utility or locate technician want to be present during any excavation near that facility and will mark as necessary. The owner will contact the excavator to determine when excavation will take place.
3F Unmarked: Marking delay requested by locate technician and agreed to by excavator per agreement.
Excavation site is unmarked. The locate technician cannot mark within two full business days. The excavator was contacted and a new deadline was scheduled.
3H Unmarked: Privately owned facilities on property, contact private facility owner directly.
Excavation site is unmarked. A locate technician went to the excavation site and found none of the facility owner’s lines there; however, there are lines of a similar facility located in that area which are considered privately owned. This happens most often with customer-owned service lines.
3M Unmarked: Marking instructions are unclear; call the utility to clarify the marking instructions.
Excavation site is unmarked. The marking instructions on the locate ticket are not clear. The description may not make sense or the description may not match what the locate technician sees at the excavation site. Contact the utility to provide clarification.
3N Unmarked: Locate description is insufficient - white lining is required per s. 556.114(3), F.S. Please contact the utility when white lining is completed.
Excavation site is unmarked. Based on the written description on the ticket, the locate technician could not determine the exact area that needed locating. White lining is required per s. 556.114(3), F.S., when the written description of the area to be located is not understandable and when the marks don't interfere with traffic or pedestrian control (i.e. placing white marks on the ground could be confused with the lines already on pavement directing pedestrian and car traffic).
3P Unmarked: Utility does not have accurate information to perform the requested locate - please contact the utility for further details per s. 556.105 (7)(a), F.S.
Excavation site is unmarked. A utility does not have accurate information about the location of those underground facilities. The utility is required, however, to give the excavator the best available information.
3R Unmarked: The excavator has performed the excavation prior to the locator's arrival.
Excavation site is unmarked. A locate technician went to the excavation site, but the excavation work had already been completed.
3T Unmarked: Extraordinary circumstances per s.556.105(8)(a) exist; call utility owner/operator provider for this location.
Excavation site is unmarked. The utility has declared extraordinary circumstances through Sunshine 811 per s.556.105(8)(a) that render them unable to respond to your locate request. Extraordinary circumstances indicate situations other than normal operating conditions such as a natural or man-made disaster.
3U Unmarked: Not service provider for this location.
Excavation site is unmarked. Another company provides the services at this location. (i.e. Two phone companies provide services near the area where excavation will occur. Only one provides service at the exact excavation site. The company that does not provide service within the exact excavation site would use this code.)
3W Unmarked: Work is being performed by the utility and the excavator will mark the underground lines per agreement.
Other
4 Clear, no facilities: The utility has no facilities at the specified excavation site.
5 No conflict: Utility is outside of the requested work site
The utility has a facility near the excavation site, but it is not within the area that was either described on the ticket or white lined.
6A Active facilities are present: The member has active facilities within the area described by the noticed demolition. Do not demolish until the member notifies you the site is clear.
8 Ongoing job: Locate tech -
HAVE ALL DIG TICKET RESPONSES BEEN SATISFIED
-
HAVE THE SAME NUMBER OF LISTED UNDERGROUND UTILITIES ON THE POSITIVE RESPONSE SHEET BEEN MARKED ON GROUND WITH PAINT:
-
STOP AND CONTACT USIC
-
IS THERE ANY INDICATION ABOVEGROUND THAT WOULD CLUE YOU TO ANY EXISTING UNDERGROUND FACILITIES THAT MAY NOT BE MARKED (fiber dips, pull boxes, old paint marks, underground risers, etc..)
-
STOP - CONTACT USIC TO VERIFY
-
PICTURES OF DIG SITE PRIOR TO DIGGING: PICTURES FROM ALL DIRECTION WITH POLE LOCTION IN ALL PICTURES
-
PICTURE#1
-
PICTURE#2
-
PICTURE# 3
-
PICTURE# 4
-
ADDITIONAL COMMENTS?
-
SOFT DIGS COMPLETED:
-
WHO COMPLETED SOFT DIGS
- SEPCO CREW
- VOS
- OTHER
-
STOP - COMPLETE SOFT DIGS AND CONTINUE
-
HAND CLEARING OF MARKED UTILITIES DONE:
-
STOP - LOCATE ALL MARKED FACILITIES
-
IF VISUAL CANNOT BE CONFIRMED HAS CONTACT BEEN MADE TO SEP OFFICE, FPL REPRESENTITIVE AND 811
-
HAS NOTIFICATION(S) TO UTILITY OWNER OF ANY UNFOUND FACILITIES BEEN MADE
-
STOP - MAKE APPROPRITE CALLS TO ANY UNFOUND UTILITY OWNERS AS WELL AS USIC AND REQUEST ONSITE VISIT TO LOCATE THIER FACILITIES - ASAP
-
FPL APPROVED VACTRUCK EXPLORATION DONE:
-
IF CROWN CASTLE FIBER IS IN MARKED AREA, HAS CROWN CASTLE EXPOSED THIER FACILITIES
-
AN “ALL CLEAR” MUST BE AGREED BY ALL PARTIES INVOLVED BEFORE DIGGING CAN BEGIN WITH UNLOCATED FACILITIES PRESENT, IF NOT WRITTEN AGREEMENT MUST BE RECIEVED FROM CUSTOMER THAT SEPCO HAS FULFILLED ALL BMP'S FOR DIGGING ACORDING TO THE CUSTOMERS REPRESENTITIVE.
SIGNATURES
-
OPERATOR SIGNATURE
-
DATE
-
SUPERVISORS SIGNATURE
-
Select date