Information

  • Job Number

  • Inspection Type

  • Lot Address

  • Conducted on

  • Inspector

  • Location

CLIENT INFORMATION

  • Address

  • Type of application being done to building

Initial inspection of blue barrier application

  • Did the job pass

  • The first part of the inspection has been assessed. The blue barrier application has been applied. <br>HAS THIS BEEN CORRECTLY APPLIED TO THE BUILDING?

  • REINSPECTION CARRIED OUT BY

  • Select date

LANDSCAPE VIEW

  • Landscape view of all sides.

ENTRY

  • Exterior window and door joinery masking and plastic sheeting has been applied correctly

  • Sealant lines to exterior soffit and wall junctions applied

  • Internal/External corners are covered with blue barrier with no drip lines

  • The ground coversheets around the building has been laid correctly with no overspray or multiple paint drops to paths or driveway noticed.

  • Columns/straight/square. Skirting square at base. Opening square.

  • Soffit was natural timber rough sawn T&G that has been prep correctly for paint.

  • Architrave mitres nailed and flush.

  • Plaster joins to walls and ceilings sanded correctly. Area free of air holes, damage and tool marks.

  • Check linen cupboard if installed.

  • Check garage PA door/jamb/hinges/margins.

  • General comments

EXTERNAL

  • Contractor has a clean working environment

  • Contractors paint and material in a located area.

  • Prepping of building for painting has been done to a excellent standard

  • Site has been left in a tidy condition.

  • Masking tape edges of the window joinery is in good condition

  • Down pipes brackets has been masked correctly

  • The blue paint has been applied evenly.

  • Drop sheets or cover sheets to stop overspray have been laid correctly

  • Scaffolding erected correctly

  • Eaves painted complete.

  • Clear plastic cover to windows complete and masked correctly with straight lines

  • The plaster coat repairs to wall is invisable

  • Temp fence installed and secure.

  • Balcony tiling complete. Sufficient fall to wastes.

  • Balcony door free of damage/ margins correct/ hinges door furniture correct.

  • Handrail spigots installed at time of inspection ( If required)

  • Fall protection in place if required

  • General Comments

  • General Comments

REAR BALCONY

  • Balcony tiling complete. Sufficient fall to wastes.

  • Balcony door free of damage/ margins correct/ hinges door furniture correct.

  • Handrail spigots installed at time of inspection ( If required)

  • Fall protection in place if required

  • General Comments

OVERALL GENERAL COMMENTS

  • Any comments not covered by above categories

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.