Information
-
Job Number
-
Inspection Type
-
Lot Address
-
Conducted on
-
Inspector
-
Location
CLIENT INFORMATION
-
Address
-
Type of application being done to building
Initial inspection of blue barrier application
-
Did the job pass
-
The first part of the inspection has been assessed. The blue barrier application has been applied. <br>HAS THIS BEEN CORRECTLY APPLIED TO THE BUILDING?
-
REINSPECTION CARRIED OUT BY
-
Select date
LANDSCAPE VIEW
-
Landscape view of all sides.
ENTRY
-
Exterior window and door joinery masking and plastic sheeting has been applied correctly
-
Sealant lines to exterior soffit and wall junctions applied
-
Internal/External corners are covered with blue barrier with no drip lines
-
The ground coversheets around the building has been laid correctly with no overspray or multiple paint drops to paths or driveway noticed.
-
Columns/straight/square. Skirting square at base. Opening square.
-
Soffit was natural timber rough sawn T&G that has been prep correctly for paint.
-
Architrave mitres nailed and flush.
-
Plaster joins to walls and ceilings sanded correctly. Area free of air holes, damage and tool marks.
-
Check linen cupboard if installed.
-
Check garage PA door/jamb/hinges/margins.
-
General comments
EXTERNAL
-
Contractor has a clean working environment
-
Contractors paint and material in a located area.
-
Prepping of building for painting has been done to a excellent standard
-
Site has been left in a tidy condition.
-
Masking tape edges of the window joinery is in good condition
-
Down pipes brackets has been masked correctly
-
The blue paint has been applied evenly.
-
Drop sheets or cover sheets to stop overspray have been laid correctly
-
Scaffolding erected correctly
-
Eaves painted complete.
-
Clear plastic cover to windows complete and masked correctly with straight lines
-
The plaster coat repairs to wall is invisable
-
Temp fence installed and secure.
-
Balcony tiling complete. Sufficient fall to wastes.
-
Balcony door free of damage/ margins correct/ hinges door furniture correct.
-
Handrail spigots installed at time of inspection ( If required)
-
Fall protection in place if required
-
General Comments
-
General Comments
REAR BALCONY
-
Balcony tiling complete. Sufficient fall to wastes.
-
Balcony door free of damage/ margins correct/ hinges door furniture correct.
-
Handrail spigots installed at time of inspection ( If required)
-
Fall protection in place if required
-
General Comments
OVERALL GENERAL COMMENTS
-
Any comments not covered by above categories