Information
-
Builder / Client
-
Site Address
-
Site Manager (Builder)
-
Prepared By
-
Start Date
-
Pictures
-
Comments
-
Read Folder
-
Read Purchase Order
-
Set Toilets
-
Install Vent For Plaster
-
Vent Completed
-
Installed 100/50 Flat Reducers
-
Installed 100/40 Flat Reducers
-
Bath Waste Connected
-
Wall Hung Basin Waste Ready For Plaster
-
Test Gas Line
-
Solar Hot Water Panel Installed
-
Solar Hot Water Panel Connected (Please specify serial number)
-
Led Work On Roof Complete
-
All Waste Pipes in Correct Locations
-
First Story Stack Installed
-
First Story Stack Tested
-
Per Plaster Complete
-
Heating Installed and Complete
-
Cooling Installed and Complete
-
Comments
-
Signature