Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Client
- Hampson Honey
- Bee One Third
- Honey Australia
- Nature's Gold
- Wicked Sting
- Other client
-
Product Type
- 500g squeeze
- 1kg squeeze
- 400g squeeze
- 1kg pail
- 25kg bucket
- 28kg bucket
- 350g comb
- 200g comb
- 95g glass
- 350g glass
- 700g glass
- 450g glass
- Other
-
Pre-production notes
-
undefined
PRE - production Inspection
-
Empty waste bin / replace liner
-
Ensure floor is clear and clean
-
* Scales are on
-
* pucks are clean and inplace
-
Check blue hand towel level
-
Check Hand soap level
-
Blue bucket / warm water & Chux for hands
-
Black bucket & scoop for spills
-
Yellow Mop bucket & hot water & bleach & Pink mop
-
Air curtain is turned on (its always on)
-
AC is turned on (as required)
-
Turn on air compressors
-
Turn on air compressor FILTER
-
Wipe down filler heads
-
Clear junk off the scramble table
-
Wipe down conveyors
-
* Bottle stock in correct amounts
-
* Cap stock in correct amounts
-
CHECK the Box machine tape roll
-
Box knife ready
-
CHEP Pallets in place
-
* Shippers stock in correct amounts
-
Production Count Sheet ready
-
* weight check & calibration paperwork
-
Label settings ready
-
Scissors & tape are ready
LABEL CHECKS
-
ZERO the label counter
HYGEINE CHECKS
-
No jewellery
-
Hands are washed
-
Waterbottles for staff
-
door is closed while in production
VERIFICATION of PRE-RUN CHECKS
-
This pre-run checklist has been completed, The equipment is clean, the room is clean , all machines and operators are Ready to begin, verified by
-
verified by Name
POST-PRODUCTION run checks
-
DATE:
-
Stack and count full shippers
-
Remove empty packaging from room
-
Drain excess honey
-
Collect & count wastage containers / lids / labels
-
Record label counts from machine
TURN OFF
-
Turn off Filling machine
-
Turn off Capping machine
-
Turn off label machine
-
Turn off Air compressor/s
-
Turn off air FILTER
-
Turn off box taping machine
-
Turn off AC
-
Turn off SCALES
-
NEW PROCESS : take the ink cartridge out and put it away * If applicable
CLEAN UP
-
Empty hopper & wipe heads
-
Empty waste bin / replace liner as needed
-
Empty WASHROOM bin
-
Remove recycling & cut down boxes
-
Wash out buckets
-
Wipe down scramble table
-
Wipe down conveyors
-
Mop & squeegee / vacuume floors
-
Empty mop bucket *& hang mop up to dry
-
Place wet floor sign
VERIFICATION of clean-down checks
-
Verified by name:
FINISHING
-
Record all data on Production Count Sheet
-
Deliver Production Count sheet to office
-
Post production notes ?