Information

  • Client

  • Document No.

  • Conducted on

  • Prepared by

  • Site Address

Site Access & Suitability

  • Is there suitable access?

  • If no to above is there alternative access?

  • Is the temporary fence in place and secure?

  • If alternate access is required will the fence need to be moved?

  • Is there sufficient room for product delivery?

  • Is there a toilet on site?

  • Is the site clean and tidy?

General Construction.

  • Does the roof construction appear complete?<br>IE : are all of the trusses installed including creepers.<br>

  • Does the frame appear to braced correctly?

  • Is the frame correctly propped?<br>IE : Permanent steel or timber props?<br>IE : If steel frame studs or batons are used they must be either back to back or box sectioned.

  • Is the Fascia&Gutter installed?

  • Are the valley's installed?

  • If there are any box gutters are they installed?

Single story Homes

  • Is the guard rail installed?

  • Is it installed to the Australian standard

Two story homes only

  • Is the scaffold in place with a current hand over certificate?

  • Has the stair void been covered.

  • Are the tiles and battens Onsite?

General Comments

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.