Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Pre Start inspection Report

Site Access

  • Are there any parking restrictions

  • Detail the parking restrictions

  • Detail obstruction and limited access for equipment.

ELECTRICAL SERVICES

  • Location of Consumer Unit

  • Is there spare capacity in Consumer Unit (min 2 spare ways)

  • Is the electrical services energised

ASHP LOCATION

  • Primary/Frige Pipe route agreed

  • Does the location of ASHP comply with Permitted Development

  • Has Planning Permission been applied for

  • Has Planning Permission been approved

  • What is the date for determination

  • MCS 020

  • Is the ASHP to be mounted on base or brackets

  • Has a suitably sized base been cast

  • Does the brick have sufficient “pull out” strength

HW CYLINDER & ANCILLARY EQUIPMENT LOCATION

  • Cylinder

  • Buffer Vessel

  • Expansion Vessels

  • Msg Filter

  • Control Panel

  • Primary Pump

  • Secondary Pump

  • Control Valves

HEATING SYSTEM

  • Connected Heating Circuits

HEATING CONTROLS

  • No of zones

  • Location of existing Thermostats

HOT & COLD SERVICES

  • Location for Combination Valve

  • Location to cut in Balanced Cold Main

G3 PIPEWORK

  • Has a route been found

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.