Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre Start inspection Report
Site Access
-
Are there any parking restrictions
-
Detail the parking restrictions
-
Detail obstruction and limited access for equipment.
- Doors
- Stairs/Corridors
- Lift
- Loft Hatch
ELECTRICAL SERVICES
-
Location of Consumer Unit
-
Is there spare capacity in Consumer Unit (min 2 spare ways)
-
Is the electrical services energised
ASHP LOCATION
-
Primary/Frige Pipe route agreed
-
Does the location of ASHP comply with Permitted Development
-
Has Planning Permission been applied for
-
Has Planning Permission been approved
-
What is the date for determination
-
MCS 020
-
Is the ASHP to be mounted on base or brackets
-
Has a suitably sized base been cast
-
Does the brick have sufficient “pull out” strength
HW CYLINDER & ANCILLARY EQUIPMENT LOCATION
-
Cylinder
-
Buffer Vessel
-
Expansion Vessels
-
Msg Filter
-
Control Panel
-
Primary Pump
-
Secondary Pump
-
Control Valves
HEATING SYSTEM
-
Connected Heating Circuits
- UFH 1
- UFH 2
- UFH 3
- Radiators 1
- Radiator 2
- Radiatorn3
HEATING CONTROLS
-
No of zones
-
Location of existing Thermostats
HOT & COLD SERVICES
-
Location for Combination Valve
-
Location to cut in Balanced Cold Main
G3 PIPEWORK
-
Has a route been found