Title Page
-
Job Number
-
Client Name
-
Site Address
-
Prepared by
-
Conducted on
Site Details
-
Site Sign Installed?
-
Access to Site
- OK
- Limited
- Construction Access to be installed Us
- Others
-
Notes
-
Boundary Pegs In? (Need critical ones and needs to be at least 3.
-
Notes
-
Cracked Footpaths?
-
Advised Council?
-
Notes
-
Overhead Power Lines?
-
Approx Distance from ground?
Site Services
-
Is the builders power installed?
-
Located the water toby? (For Rural check if trickle feed available) If so take photo of water meter
-
Toilet On Site?
-
Any other issues to note?
Site Works
-
Retaining
- Needs to be done before excavation
- Needs to be done after excavation
- Not Required
-
Lawns? Do they need to be cut before excavation
-
Other Notes
-
Sign off