Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Bid Date
-
Estimator:
-
Comments:
En Route to Site
-
Narrow Roads?
-
Sharp Turns?
-
Load Restrictions?
-
Overhead Obstructions?
-
Plant/Gated Security?
-
Alternate Routes?
-
Signs of Previous Inclement Weather?
-
Today's Weather
-
Temperature
-
Site Representatives (Name and Title)
Site Utilities
-
Power (Description and Distance)
-
Volts
-
Amps
-
Phase
-
Is existing power adequate?
-
Will overhead power lines restrict operations?
-
Will underground power lines restrict operations?
-
Is there a hookup and/or use charge for power?
-
What distribution problems are likely?
-
Water (Source and Capacity)
-
Is existing water (fire and domestic) adequate?
-
Is there a hookup and/or use charge for non-potable water?
-
Nearest available source for potable water?
-
Is there a hookup and/or use charge for potable water?
-
Gas (Source and Capacity)
-
Is existing gas source adequate?
-
Is there a hookup and/or use charge for gas supply?
-
Are alternate sources available?
-
Is there a hookup and/or charge for temporary gas?
-
Compressed Air
-
Is compressed air required?
-
Is there an existing distribution system available?
-
Is this adequate?
-
Can single units handle rather than a distribution system?
Site Conditions
-
Groundwater
-
Is the area well drained?
-
Will a Wellpoint system be required?
-
Is the area subject to flooding?
-
Comments
-
Clearing and Excavation
-
Are permits required for clearing or excavation?
-
Is disposal area available?
-
Are there ground level or underground obstructions?
-
Are obstructions located visibility on design documents?
-
Disposal area dump fees are?
Construction Site Logistics
-
Is there adequate space for:
-
Offices?
-
Storage trailers?
-
Materials lay-down/staging?
-
Staff and/or trade parking?
-
Construction traffic?
-
Are improvements or new construction required for:
-
Offices?
-
Storage trailers?
-
Materials lay-down/staging?
-
Staff and/or trade parking?
-
Construction traffic?
Regulatory and Permit Requirements
-
Land Disturbance Permit
-
Responsible for cost
-
Authority Having Jurisdiction (AHJ)
-
Building Permit
-
Responsible for cost
-
Authority Having Jurisdiction (AHJ)
-
Other Permit(s)
-
Responsible for cost
-
Authority Having Jurisdiction (AHJ)
Local Material, Labor, Subcontractor and Labor Supply
-
Are local suppliers available for:
-
Small tools and consumables?
-
Equipment rentals?
-
Office supplies and furnishings?
-
Construction materials?
-
Comments