Title Page
-
Work Order
-
Job Name
-
Account Holder/ General Contractor
-
Conducted on
-
Site address
-
Prepared by
-
Site Contact Information
-
Account Executive
Site Details
-
What is the Customer's target installation date?
-
What is the estimated delivery date of material?
-
What Equipment is needed?
-
Equipment requirements ( reach, capacity, non-marking tires)
-
Drop off location/ Instructions ( NW corner, at ramp, need escort, inside building, dock height, etc.)
-
Safety Requirements
-
What are the hours of operation onsite?
-
Is hot work being performed?
-
Who will supply permit?
-
Is the jobsite free from obstructions for install?
-
Is the ramp poured?
-
Is there access other than ramp for equipment or deliveries?
-
Is concrete poured in areas of installation?
-
Can we proceed with the installation without removing existing dock/door equipment?
-
Do we need to order a dumpster?
-
Do we need to haul away?
-
Are all positions available at one time?
-
What is the plan for position use?
-
Scope of work
-
Additional notes or comments:
-
List all field supplies needed for entire job
-
Are there any issues limiting or preventing a prompt installation?
Equipment Details
-
Are High Speed Doors being installed?
-
Attach approved drawings, verify clearances, quantity and electrical requirements
-
Does the install require an Electrical Scope?
-
What portion of the electrical is Miner responsible for?
-
What is the Mounting Surface?
-
Any additional field supplies needed?
-
Are sectional doors being installed?
-
Attach approved drawings, verify clearances, quantity and electrical requirements
-
Does the install require an Electrical Scope?
-
What portion of the electrical is Miner responsible for?
-
What is the Mounting Surface?
-
What field supplies are needed?
-
Are coiling doors (including fire rated doors) or grilles being installed?
-
Attach approved submittals, verify clearances, quantity and electrical requirements
-
Does the install require an Electrical Scope?
-
What portion of the electrical is Miner responsible for?
-
What is the Mounting Surface?
-
What field supplies are needed?
-
Are levelers being installed?
-
Attach approved submittals, verify pit dimensions and quantity
-
Does the install require an Electrical Scope?
-
What portion of the electrical is Miner responsible for?
-
What is the Mounting Surface?
-
What field supplies are needed?
-
Are track guards being installed?
-
Verify type and quantity
-
What is the Mounting Surface?
-
What field supplies are needed?
-
Are bumpers being installed?
-
Verify quantity, type and mounting surface
-
What is the Mounting Surface?
-
What field supplies are needed?
-
Other equipment being installed?
-
Attach approved submittals, verify clearances, quantity and electrical requirements
-
Does the install require an Electrical Scope?
-
What portion of the electrical is Miner responsible for?
-
What is the Mounting Surface?
-
What field supplies are needed?