Information

  • Document No.

  • Job Name

  • Conducted on

  • Prepared by

  • Location
  • Superintendent/Safety Officer

Administrative

  • OSHA 300 forms posted and complete?

  • OSHA poster posted?

  • Phone number for nearest emergency medical facility posted?

  • Is the medical facility within 15 minutes of the job site or is there an employee trained in first aid and CPR on the site?

  • Weekly safety meetings up to date?

  • Work areas indicated with proper signage and barricaded?

  • All employees and subcontractors have attended the job site safety orientation?

  • Is potable drinking water available on site including cups and trash can?

  • Are adequate toilet facilities available at the site?

  • Is a first aid kit including a CPR barrier provided and maintained including an inventory log?

  • Is protection for blood borne pathogens available?

  • Other?

  • Add media

Housekeeping

  • General neatness of work area?

  • Projecting nails bent over or removed?

  • Waste containers provided and used?

  • No debris being dropped to a lower level without 42" barricades 6' back from projected edge or more than 20' without a chute?

  • Passageways and walkways clear (24" minimum)?

  • Other?

  • Add media

Fire Prevention

  • Adequate fire extinguishers provided? (3000sf per extinguisher with max travel of 100')

  • Fire extinguishers have annual certification and are checked monthly including date and initials?

  • Phone number of fire department posted?

  • No smoking signs posted and enforced near flammables?

  • Hot work permits issued for all flame or spark producing activities?

  • Other?

  • Add media

Electrical

  • Assured grounding program in use on site?

  • All flexible cords are protected from damage? (Placed against corridor walls or elevated 7')

  • Flexible cords or equipment cords with compromised insulation, missing ground pins or other damage are removed from service and tagged?

  • GFCI in use with all power tools including those connected to existing wiring in a renovation?

  • All electrical boxes are equipped with the required covers?

  • Temporary electrical panels are properly labeled and clearances maintained?

  • All openings in electrical panels/boxes are properly closed?

  • All cabinets, panels, switches, and outlets in potentially wet locations are rated for the potential exposure?

  • Lockout/tagout is maintained on all electrical circuits including all permanent panels that have been energized?

  • Other?

  • Add media

Hand, Power, and Powder Actuated Tools

  • Hand tools are inspected regularly? No broken handles or mushroomed heads?

  • Guards are in place on machines and saws?

  • Manuals available for all power tools?

  • Correct tool being used for the job?

  • Operators of powder actuated tools are licensed?

  • Spent or unused loads are properly stored or disposed of?

  • Other?

  • Add media

Fall Protection

  • Safety rails and cables are secured properly?

  • Workers exposed to fall hazards greater than 6' are tied off?

  • Subcontractors using personal fall arrest systems have a competent person on site?

  • Fall protection plan on site for any work not utilizing standard fall protection?

  • Workers using body belts for positioning only?

  • Employees below are protected from falling objects?

  • All edges or openings that could expose workers to falls of greater than 6' are properly barricaded or otherwise protected?

  • Other?

  • Add media

Ladders

  • Ladders extend at least 3' above the landing?

  • Extension ladders maintain a 1:4 base to height distance ratio?

  • Ladders are secured to prevent slipping, sliding, or falling?

  • Stepladders are used only in the fully open position?

  • No workers are standing on the top two steps of step ladders?

  • Damaged ladders are taken out of service and tagged out?

  • All manufacturers labels are present and legible?

  • Other?

  • Add media

Scaffolding

  • Subcontractor utilizing scaffolding has a competent person on site while work is being performed?

  • All scaffolding is properly tagged?

  • Scaffolding is inspected daily by a competent person?

  • Scaffolding is erected on a sound footing?

  • Guard rails, mid rails, toe boards and screens are in place?

  • Planking is sound and sturdy?

  • Workers below protected from falling objects?

  • Working levels are fully planked with platforms no less than 18" in width?

  • Proper access is provided to all working levels? (Starting within 24" of the ground and rung spacing or no more then 16 3/4"?

  • Scaffolds exceeding 1:4 least base width to height ratio properly secured to structure? (Repeated every 26' or less)

Floor & Wall Openings

  • All floor or deck openings are covered with a properly identified secured cover or barricaded?

  • Perimeter protection is in place and properly maintained?

  • All decking is properly secured?

  • All materials are stored away from the edge?

Trenching, Excavation, & Shoring

  • Subcontractors engaging in trenching or excavating has competent person on site while work is being performed?

  • Underground utilities have been properly located and positively identified (potholed)?

  • Trenches/excavations are inspected daily or after any significant event by competent person and documented?

  • Excavations 4' or deeper have been tested for hazardous atmospheres?

  • Excavations 4' or deeper have a safe means of egress within 25' of lateral travel?

  • Excavations over 5' deep are properly sloped or protective systems are in use?

  • Materials and loose soils are at least 2' from the edge of the excavation?

  • Equipment is a safe distance from the edge of the excavation?

  • All employees exposed to vehicular traffic are wearing the appropriate high visibility vests?

  • Other?

  • Add media

Material Handling

  • Materials are properly stored and stacked?

  • Employees are using proper lifting methods?

  • Proper number of workers for each operation?

  • Tag lines used to guide loads?

  • Other?

  • Add media

Welding & Burning

  • Hot work permits issued for each activity producing sparks or flame?

  • Proper distance maintained between fuel cylinders and oxygen? (20' min.)

  • Cylinders properly secured with cable cover caps installed when not in use?

  • Burning/welding goggles or shields are used?

  • Fire extinguisher is readily available?

  • Hoses, regulators, and torches are in good working order?

  • Fire watch is maintained for spark/fire producing activities within close proximity to combustible materials?

  • Other?

  • Add media

Cranes

  • Crane has a current annual inspection?

  • Operator holds the proper credentials to operate the crane?

  • Crane is free of leaks and mechanically sound?

  • Crane operators logs are up to date?

  • Load charts are posted on the crane?

  • Hand signal charts are on crane?

  • Rigging personnel are trained and have written documentation demonstrating training?

  • Outriggers are extended, crane is level, and proper supporting materials are used?

  • All rigging equipment is inspected and reigned as required?

  • Swing radius of crane is properly barricaded?

  • No workers are positioned under suspended loads unless they are required as part of the lifting operation?

  • Other?

  • Add media

Masonry & Concrete Construction

  • Employees a protected from cement dust?

  • Exposed skin is covered?

  • Runways are adequate?

  • Walls over 8' are supported?

  • All protruding reinforcing rods and other implement hazards are covered?

  • All cutting activities are conducted in such a manner as to eliminate the production of dust?

  • Other?

  • Add media

Personal Protective Equipment

  • Hard hats are being worn at all times?

  • Safety glasses are being worn at all times?

  • High visibility clothing is being worn at all times, including the use of Class II vests when exposed to heavy equipment or vehicle traffic?

  • Hearing protection being used when required?

  • Respirators are being used when required?

  • All companies utilizing respirators have provided a hard copy of their respiratory protection plan?

  • Leather boots are being worn by all personnel and protective toed boots are being worn where required?

  • Face shields are being worn by workers participating in cutting operations requiring face protection?

  • Other?

Equipment & Vehicles

  • Daily vehicle inspections are completed for all equipment prior to its use?

  • Equipment that does not pass the vehicle inspection is tagged out?

  • Seat belts are available on all equipment and are in use?

  • All workers in proximity to moving equipment are wearing Class II clothing unless the hazard requires higher rated clothing?

  • Other?

  • Add media

Stairs

  • All personnel access points with a break in elevation exceeding 19" have a stairway, ladder, or ramp provided for access?

  • All flights of stairs with 4 or more risers are equipped with handrails?

  • Other?

  • Add media

Miscellaneous

  • The contractor's corporate safety manual is available on site?

  • A safety manual for each subcontractor is available on site?

  • A written hazard communication program is on site including all MSDS/SDS information?

  • Exposure to lead, asbestos, and other known hazardous materials is controlled?

  • Other?

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.