Information

  • Project Name

  • Client Name

  • Site Location
  • Conducted on

  • Prepared by

SITE DESCRIPTION

  • Provide a brief description of the site/building

  • Attach a photo of the site/building

ROOF TYPE

  • Attach a photo of the roof profile

  • Tin Roof

  • Tile Roof

  • Non-Permeable

  • Other

  • Provide distance between purloins

AVAILABLE ORIENTATION

  • Western Orientation (270° - 290°)

  • Northwestern Orientation (290° - 335°)

  • Northern Orientation (335° - 20°)

  • Northeastern Orientation (20° - 65°)

  • Eastern Orientation (65° - 90°)

BUILDING HEIGHT

  • Height

CABLE RUNS

  • DC length

  • AC length

METER BOX

  • Attach a photo of the meter box

  • Is net metering available

SHADING

  • Shading Level

ENVIRONMENT

  • Risk of Dust/Dirt Contamination

SITE ACCESS

  • Access Restrictions

GRID INFORMATION

  • Provide grid voltage

  • Select grid form

NOTES

  • Provide any other information that may impact system design or performance

  • Attach a photo where possible to evidence issues that may impact system design or performance

THE SITE INSPECTION IS COMPLETE. PLEASE PRESS FINISH BELOW TO SUBMIT THE REPORT.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.