Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Date & Time of audit
-
Works inspected:
-
OSP picture
-
Work performed by:
-
Seperation
- A
- B
- C
- D
- E
- F
- G
Checklist results key:
-
NW - Not Witnessed
-
UA - Un-Assessable
-
S - Satisfactory
-
NS - Not Satisfactory
Asbuilds and alignment information
-
As build & alignment information provided
-
Evidence of certification by other parties
-
VicRoads Rep
-
Visionstream Rep
Communication Pit
-
All pit entries have spigots correctly fitted to ensure no sharp edges on the entry of each conduit
-
Conduits shall only enter and exit communications pits from the end walls and not from the side walls or floor of the pits
-
Lowest point of conduits entering or exiting pits shall be no less than 100mm above the floor of the pit
-
The centerline of conduits entering and exiting pits shall not have vertical difference of more than 50mm
-
Cross members installed
-
Pit sides NOT buckled or squashed
-
Pits are clean and free of debris
-
Width of concrete apron : 200mm and Depth with Rebar: 200mm
-
Pit set horizontally (level) / above ground around it / shoring where necessary
-
Work site left cleaned and tidy
-
Blue/Yellow communication grade rope has been installed and s continuous through conduit network
-
Cable pit lids shall be VicRoads type approved, indelibly, labelled both "VicRoads" and "Electrical", "Communication" or "Traffic Signals" as appropriate in accordance with VicRoads Standard Drawing TC 1220
-
VicRoads Rep
-
Visionstream Rep
Power Pit
-
Distance from top of the pit and top of the pipe to be between 500mm and 700mm
-
Distance from bottom of the pipe to crushed rock to be 100mm or more
-
Blue/Yellow communication grade rope has been installed and s continuous through conduit network
-
Pits are clean and free of debris
-
Width of concrete apron : 200mm and Depth with Rebar: 200mm
-
Pit set horizontally (level) / above ground around it / shoring where necessary
-
Accessibility of the pit in respect of the road
-
Work site left clean, tidy and safe
-
Cable pit lids shall be VicRoads type approved, indelibly, labelled both "VicRoads" and "Electrical", "Communication" or "Traffic Signals" as appropriate in accordance with VicRoads Standard Drawing TC 1220
-
VicRoads Rep
-
Visionstream Rep
Pipe
-
As per the standard of the Governing Body, where conduit is installed using the trenching method, approved PVC marker tape shall be installed 300mm below the ground level. The marker tape shall be minimum of 75mm in width and fitted with at least two (2) trace wires. At least two meters of each trace wire shall be anchored to the left neatly coiled within each pit.
-
As per the standard of the Governing Body, internal bearer 2 pair telephone cable (drop wire) shall be drawn through all conduits installed by the boring method. At least two meters of the internal bearer telephone cable shall be anchored to and left neatly coiled in each access pit.
-
VicRoads Rep
-
Visionstream Rep
General findings:
Recommendations:
Specific findings:
-
Type of asset:
-
Passed:
Sign-off
-
Select date
-
Attendees:
-
Report prepared by:
-
Issued to:
-
VicRoads Rep
-
Visionstream Rep