Information

  • Project

  • Project Number

  • Conducted on

  • Peter Barlow CMIOSH, IMaPS, MIIRSM

  • Number of Personnel affected by this Fire Risk Assessment

Project Details

  • Project Name:

  • Project Number:

  • Name of Fire Risk Assessor:<br><br>Peter Barlow<br>Senior H&S Manager<br>Parkeray Ltd

  • Contact Number:<br><br>Office: 020 7378 4567<br>Mobile: 07966115425

  • Fire Risk Assessment Part or Whole of Building?

Details of Assessment:

SECTION 1: IDENTIFY SOURCES OF IGNITION

  • 1: Smoking Materials:

  • 2: Naked Flame:

  • 3: Cooking Facilities:

  • 4: Machines:

  • 5: Plant - Lift:

  • 6: Plant - Boiler

  • 7: Plant - Air Conditioning:

  • 8: Plant - Ventilation Equipment:

  • 9: Plant - Other, (Please Specify)

  • 10: Extension Leads & Multipoint Adaptors:

  • 11: Portable Electrical Equipment:

  • 12: Heaters:

  • 13: Lighting Equipment:

  • 14: Hot Surfaces:

  • 15: Arson:

SECTION 2: IDENTIFY SOURCES OF FUEL

  • 1: Flammable Liquids, Solids and Chemicals:

  • 2: Flammable Gases:

  • 3: Timber, Paper and Card:

  • 4: Furniture, Fittings and Fixtures:

  • 5: Textiles:

  • 6: Packaging Materials:

  • 7: Waste Materials:

SECTION 3: PEOPLE AT RISK

  • 1: Do Employees Work in Areas of High Risk?

  • 2: Can Employees React Quickly to a Fire or Alarm?

  • 3: Do Employees Work Alone or in Remote Areas?

  • 4: Are all persons (e.g. visitors) made aware of emergency procedures?

  • 5: Can large numbers of people who are unfamiliar with the premises be present?<br>

  • 6: Are any employees particularly at risk from the task they carry out?

  • 7: Are persons with special needs at risk?

SECTION 4: STRUCTURAL FEATURES THAT MAY ALLOW FIRE TO SPREAD

  • 1: Have all building alterations been approved by building control?

  • 2: Will any structural features allow rapid fire spread?

  • 3: Is there any potential for rapid heat spread?

  • 4: Are there any areas where smoke may travel?

  • 5: Are escape routes likely to be affected in the early stages of a fire?

  • 6: Are there any raised storage areas (mezzanine floors).

  • 7: Is fire stopping satisfactory between compartments?

SECTION 5: MEANS OF ESCAPE

  • 1: Can all occupants easily escape from a fire?

  • 2: Are there any unacceptable "Dead End" situations?

  • 3: Can the premises be evacuated within 2 minutes?

  • 4: Do all escape routes lead to a place of safety?

  • 5: Are all escape routes free from combustible materials?

  • 6: Are all escape routes un-obstructed ?

  • 7: Are escape routes free from tripping hazards?

  • 8: Are stairs in a good state of repair?

  • 9: Are escape corridors and stairs structurally protected?

  • 10: Are escape routes of sufficient width?

  • 11: Where required, do all doors open in the direction of escape?<br>

  • 12: Are all doors easy to open without the use of a key?

  • 13: Are all self closing fire resistant doors functioning?

  • 14: Is general lighting on escape routes sufficient?

  • 15: Is escape / emergency lighting adequately protected?

  • 16: Are all escape routes adequately protected with pictograms?

  • 17: Are adequate escape provisions in place to deal with DDA?

SECTION 6: FIRE DETECTION AND WARNING SYSTEMS

  • 1: Are arrangements in place for detecting fire?

  • 2: Are there arrangements in place for giving a warning in a fire?

  • 3: Will the detection give sufficient warning in the event of a fire?

  • 5: Is automatic fire detection provided in areas where a fire may develop in areas unnoticed?

  • 6: Is automatic fire detection provided to protect escape routes?

  • 7: If automatic fire detection is provided is it routed to a central alarm collector station or fire brigade?<br>

  • 8: Is the fire warning signal audible or visual throughout the premises?<br>

  • 9: If a fire warning system is installed is it maintained in accordance with current standards?<br>

  • 10: Is Emergency Lighting maintained in accordance with current standards<br>

SECTION 7: FIRE FIGHTING EQUIPMENT

  • 1: Is suitable and sufficient fire fighting equipment provided?

  • 2: Is fire fighting equipment correctly sited?

  • 3: Is fire fighting equipment visible or signed?

  • 4: Are sufficient numbers of employees competent in the use of fire-fighting equipment?<br> <br>

  • 5: Are any part of the premises protected by water sprinkling systems?

  • 6: Are there any other fire suppression systems installed?

  • 7: Is all fire-fighting equipment properly maintained?<br>

SECTION 8: FIRE EMERGENCY PLAN AND TRAINING

  • 1: Is there a comprehensive Building fire emergency plan?<br>

  • 2: Are all operatives and Project staff aware of what action to take in the event of a fire?

  • 3: Are the staff trained in fire evacuation?<br>

  • 4: Is there an established muster point?

  • 5: Are there proper arrangements for calling the Fire Brigade?<br>

  • 7: Has information been provided in terms of any special fire or rescue risks?

  • 8: Is training carried out in fire routine and fire emergency plan?<br>

  • 9: Do all staff receive induction training in fire safety procedures?<br>

  • 10: Are procedures in place to control any changes or the hazards into the workplace?<br>

SIGNIFICANT FINDINGS

  • 1: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 2: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 3: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 4: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 5: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 6: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • 7: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 8: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 9: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

  • 10: ACTION IDENTIFIED & DATE FOR COMPLETION OF ACTIONS:

  • Select date

This Fire Risk Assessment document must be reviewed on a sixth monthly basis. It must also be reviewed whenever any material changes take place in the workplace or where there has been a significant development on the project this should also be incorporated into the Construction Phase Plan.

  • Assessors Signature:

  • Select date

  • Project Managers Signature:

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.