Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Persons Present

Warranty

  • Warranty Start Date

  • Warranty End Date

  • Warranty Calls

General

  • Roller Shutter Operation

  • Lift Operation

  • Doors and Locks

  • CCTV

  • Key Handover

  • Cash Tube Operation

  • Till Operation

  • Furniture

  • Shop Fitting

Electrical Checklist

  • Operation of Lights

  • Signage Lighting

  • Emergency Lighting

  • DB Board Location

  • Isolations

  • IT System

  • Telephone Points

Mechanical Checklist

  • Plant Locations

  • Air Conditioning Operation

  • Ventilation Operation

  • Refrigeration Operation

  • Hot Water Heater Operation

  • Water Isolations

  • Coffee Catcher Operation

Cleaning & Maintenance Procedures

  • Air conditioning

  • Waste Pumps

  • Chillers & Condensers

  • Coffee Catchers

Equipment Checklist

  • Equipment present

  • Equipment Item
  • Equipment Item

  • Equipment Tested and Working?

Fire Precautions

  • Sprinkler System

  • Fire Alarms

  • Fire Suppression System

  • Compartmentation

  • Gas Interlock

Certification

  • Electrical

  • Emergency Lightning

  • Chlorination

  • Fire Alarm

  • Fire Suppression

  • Sprinkler System

  • Gas

  • Building Control Approval

RDA Signatory

  • Add signature

Client Signatory

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.