Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Persons Present
Warranty
-
Warranty Start Date
-
Warranty End Date
-
Warranty Calls
General
-
Roller Shutter Operation
-
Lift Operation
-
Doors and Locks
-
CCTV
-
Key Handover
-
Cash Tube Operation
-
Till Operation
-
Furniture
-
Shop Fitting
Electrical Checklist
-
Operation of Lights
-
Signage Lighting
-
Emergency Lighting
-
DB Board Location
-
Isolations
-
IT System
-
Telephone Points
Mechanical Checklist
-
Plant Locations
-
Air Conditioning Operation
-
Ventilation Operation
-
Refrigeration Operation
-
Hot Water Heater Operation
-
Water Isolations
-
Coffee Catcher Operation
Cleaning & Maintenance Procedures
-
Air conditioning
-
Waste Pumps
-
Chillers & Condensers
-
Coffee Catchers
Equipment Checklist
-
Equipment present
Equipment Item
-
Equipment Item
-
Equipment Tested and Working?
Fire Precautions
-
Sprinkler System
-
Fire Alarms
-
Fire Suppression System
-
Compartmentation
-
Gas Interlock
Certification
-
Electrical
-
Emergency Lightning
-
Chlorination
-
Fire Alarm
-
Fire Suppression
-
Sprinkler System
-
Gas
-
Building Control Approval
RDA Signatory
-
Add signature
Client Signatory
-
Add signature