Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Site Welfare and prestart checks

  • Engineers wearing safety boots?

  • Engineers wearing appropriate work trousers?

  • Engineers wearing hi-vis vests?

  • All engineers have a in-date MCS ID card?

  • Materials checked against quote, stored in a safe location and no accessible to the public?

  • Hand wash facility on site?

  • Toilet facility on site?

  • Waste storage on site?

  • RAMS on site and induction registers signed by all operatives?

  • Asbestos survey on site?

  • Sign in sheet on site?

  • Rest area on site?

  • Parking Available on site?

  • First Aid Kit onsite, in date and been replenished when used?

  • Accident book on site?

  • Safe isolation kit for each engineer?

  • Warning/Danger signs onsite?

  • Portable appliances are PAT tested and only being plugged into 30ma RCD protected socket outlets?

  • Access equipment and ladders tagged?

  • Relevant PPE available for each engineer on site? <br>● Dust masks<br>● Safety gloves<br>● Eye protection<br>● Ear protection<br>● Safety signs men at work<br>● Crawl boards (if required)<br>● Battery work/loft lights

  • Asbestos unlicensed works required?

  • Is all of the following available?<br>● Asbestos hoover<br>● Red and clear asbestos bags<br>● Duct tape<br>● Doffing wipes<br>● Polythene floor protection sheets<br>● Over shoes<br>● Type 5-6 Oversuits<br>● Dustbin Chain and Padlock<br>● Face fitted JSP mask<br>● Asbestos signage

  • At risk register supplied by customer?

  • Operatives who have medical conditions: Have appropriate medical wristbands/cards, Have medication with them at all times and first aider aware?

  • Letters sent to site contact and residents aware of works to be carried out?

Quality of work - First Fix Inspection

  • Installed as per design drawing and specification (unless variations/alterations arise)?

  • Cable containment and equipment securely fixed?

  • Boxes, Accessories, Panels and containment level?

  • Device bases mounted in correct locations, heights and distances in line with relevant regulations?

  • Trunking, conduit, tray installed neatly and asper spec with bends and caulked where required?

  • Correct fixings used for the material of the building (i.e plasterboard fixings)?

  • Cables fixed every 300mm where required?

  • Holes sealed as we go to maintain fire proofing. Large holes temporarily filled with insulation?

  • As fitted drawings completed directly after installation of cabling?

  • Loop readings recorded and emailed into projects mailbox?<br>● Continuity end to end (per conductor positive, negative, CPC)<br>● Insulation resistance (P-N, N-CPC, P-CPC)

  • Screws, Resistors and other necessary items kept safe for second fixing?

  • All keys handed to responsible person? Please put the persons name the keys have been handed to, the key type and quantity.

  • Photos taken of panel/s uploaded on Simpro?

  • 230v cables segregated from 24v cables?

Quality of work - Second Fix Inspection

  • No exposed electrics and terminals left exposed/open?

  • Devices labelled where necessary (i.e Part 1 fire alarm devices)?

  • Terminations are tight, neat and no excess copper showing?

  • Asset tags fitted and logged where required?

  • Electrical supply to Part 1 systems -<br>● Taken from as close as practicable to incoming mains?<br>● Not fed from a board likely to be isolated for mechanical maintenance i.e dedicated EML lighting board or lift fuse board?<br>● Correct size MCB, fuse or RCBO fitted for load and installation method?<br>● Circuit not on a common RCD?<br>● 30ma RCD protected if cables are buried<br>● Test/certification carried out and uploaded to easicert?<br>● Circuit labelled “Fire alarm do not switch off”?

  • Residents properties - Lighting/smoke circuit tested and uploaded to easicert. Minor works for additional equipment on a circuit?

  • Part 6 systems -<br>● Aico devices house coded and tested?<br>● Aico devices asset tagged and uploaded?<br>● Aico triggers the warden call? (THIS IS REQUIRED TO BE TESTED AND VERIFIED AS SOON AS THE INSTALLATION IN THE FLAT IS FINISHED. CHECK WITH THE CALL CENTRE “i.e. CENTRA” THE FLAT NUMBER IS CORRECT AND THEY RECEIVED A FIRE SIGNAL)?<br>● Circuit labelled “SMOKE DETECTORS”

  • Update Simpro for office to book third party engineers for connection of output devices to safety shutdowns (i.e. Lift engineer)?

Quality of work - Post finish, Pre-Commissioning and Pre-handover Inspection

  • Emptied site and cleaned?

  • Making good complete as far as practicable (unable to finish until commissioned)?

  • Zone chart frames fitted?

  • As fitted drawings are completed. Photo taken and uploaded on Simpro. Original hard copy left for commission engineer?

  • ALL Electrical test sheets complete and submitted on easicert before leaving the site?

  • Asset tagging complete?

  • Document box fitted?

  • All keys and documents left in the documentation box or with responsible person?

  • Follow on work required emailed into projects mailbox?

  • Final update completed on Simpro?

Outstanding works, Status and Snagging

  • Areas checked during inspection?

  • Is the installation finished?

  • What is left to finish?

  • Snags found to be rectified?

  • List snags including location, materials required and photos

Declaration

Sign off

  • I confirm all of the above checks have been completed. An adequate sample of each engineer on site’s work has been checked. Any items that have not been completed have been reported to the projects department.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.