Management Controls

  • Is the site file and associated documents available for inspection and compliant with company requirements?

  • The site file is available for inspection and all sections are completed up to date and relevant to the work being carried out with all operatives signed up.

Access and Egress

  • Are adequate access and egress routes established, well maintained and free from trip hazards and materials?

  • Access and egress routes are established, well maintained and free from trip hazards and materials?

  • Access to the word face is suitable and free from ruts, obstructions and excessive mud?

Scaffolding foundations and support

  • Are scaffolding foundations firm, level and well prepared to accept scaffolding imposed loadings?

  • scaffolding foundations are firm, level and well prepared to accept scaffolding imposed loadings?

  • No excavations or service voids are present adjacent to the scaffolding structure?

Scaffolding structure

  • Scaffolding structure is erected, used and maintained in accordance with best practice and current guidelines?

  • Sole pads and base plates are installed correctly and free from damage or defect?

  • Standards are installed correctly and free from damage or defect?

  • Ledgers are installed correctly and free from damage or defect?

  • Transoms are installed correctly and free from damage or defect?

  • Bracing are installed correctly and free from damage or defect?

  • Are all boarded lifts compliant with current best practice and guidance?

  • Guard rails are compliant with current best practice and guidance?

  • Boards /pans are compliant with current best practice and guidance?

  • Platforms are compliant with current best practice and guidance?

  • Are all ladder access points compliant with current best practice and guidance?

  • Ladder access points are compliant with current best practice and guidance?

  • Are all ties compliant with current best practice and guidance?

  • Ties are installed correctly in accordance with recommended tie patterns and spacing a and free from damage or defect?

  • The client is ultimately responsible for ensuring that the existing structure is capable of supporting loads imposed upon it by the attachment of any scaffolding.

  • Are all buttresses and support rakers compliant and in accordance with best practice and guidance?

  • All buttresses and support rakers are compliant with current best practice and guidance?

  • Are all stair towers compliant with current best practice and guidance?

  • All stair towers are compliant with current best practice and guidance?

  • Are all loading bays compliant with current best practice and guidance?

  • All loading bays are compliant with current best practice and guidance?

  • Are all special scaffold compliant current best practice and guidance?and has a design been completed?

  • All special scaffolds are compliant with current best practice and guidance?

PPE

  • Is all PPE worn and used in accordance with current best practice and guidance?

  • All PPE is worn and used in accordance with current best practice and guidance?

  • All PPE is company branded and not displaying other contractor branding?

Attitude and Behaviour

  • Are Operatives well behaved and do the show a positive polite attitude towards others and their work?

  • Operatives are well behaved and display a polite and positive attitude.

Competence and Awareness

  • Are operatives aware of site rules and understand requirements of the plan of work?

  • Operatives are aware of site rules

  • Operatives are aware of SG4:10 and how they can comply with its requirements.

  • Operatives are aware of the requirements of the plan of work for the project?

Operatives comments and feedback

  • Do operatives have any issues, safety concerns or suggestions for improvements ?

Additional observations

  • Any additional observations?

Sign Off

  • I confirm I have had the contents of this audit report explained to me and that all non-conformances must be rectified / closed out in a timely manner.

  • Site Supervisor

  • Person completing the Audit

  • Audit concluded at:

Closure

  • All actions in this report have been competed

  • Person completing close out

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.