Information

  • Document No.

  • Client

  • Site

  • Controlling Scaffold Manager:

  • Controlling Scaffold Branch:

  • Auditor

  • Conducted on

  • Location

Documentation

Documents and Records

  • Have all PSL operatives signed in to site correctly?

  • A copy of the previous site inspection report is:

  • From a sample set, are all scaffold handover Certs completed correctly?

  • Is the scaffolding site file accessible and available for inspection?

  • Is a copy of the PSL Worksafe policy present?

  • A copy of the site scaffolding Plan of Work is:

  • Are PSL charged with carrying out statutory scaffolding inspections on site?

  • The scaffolding register is:

  • The Scaffold inspection records are:

  • Are scaffold designs, compliance sheets or manufacturers guidance available for all scaffolding / temporary works being carried out by PSL on site?

  • Is a copy of the agreed scaffolding quote / specification in the file?

  • Scaffold anchor test record sheets are:

  • Plant and Equipment inspection records are:

  • Plant and Equipment test certificates are:

Material Storage

Material Storage

  • Is there a designated area to store scaffolding materials?

  • Are all materials stored neatly and securely?

  • Has quarantine area or stillage been clearly identified for all non conforming materials?

Access and Egress

Site Access and Egress

  • Does the site have appropriate walkways and segregation for operatives navigating site?

  • Are the walkways clear and free from obstructions or trip hazards?

Manual Handling

Manual Handling

  • Is there mechanical assistance for transporting scaffolding materials around site? ( forklift?)

  • Are all proposed transit routes free from obstruction and trip hazards?

Scaffolding Structure

Scaffolding

  • Scaffolding Structure

  • Scaffold
  • Do scaffolding foundations appear well prepared to support proposed scaffold loadings?

  • Would the inadequacy of been visibly apparent or easily identifiable prior to the scaffolding erection?

  • Scaffolders must ensure they carry out a full visual inspection of the proposed foundations prior to erection of the scaffolding. Any soft spots, voids or areas for concern must be brought to the attention of the scaffolding supervisor and the client.

  • The client must ensure that all scaffolding foundations are suitably prepared / checked to accept the proposed scaffolding loads.

  • Are all sole pads and base plates positioned correctly and free from defects?

  • Are all standards acceptable?

  • Are all facade braces acceptable?

  • Are all ledgers acceptable?

  • Is all ledger bracing acceptable?

  • Are all transoms acceptable?

  • Are all guardrails acceptable? (Including brick guards)

  • Are all toeboards acceptable?

  • Are all platforms acceptable? (Including hop-ups and inside boards)

  • Are all ties or support arrangements acceptable? (Including buttresses)

  • Are all loading bays erected correctly and in good working order?

  • Are all access and egress arrangements acceptable? (Including Stairs or Ladders)

  • Is the scaffolding erected in accordance with the approved design or compliance sheet?

PPE

PPE

  • Are all operatives wearing correct PPE with PSL branding?

  • Is all PPE in good condition and free from defects or excessively soiled?

  • Are all operatives harness and lanyards in good condition and less than 5 years old from date of manufacture?

Operatives

Operatives

  • Do operatives display a positive and helpful nature?

  • Can operatives display knowledge of the POW, site rules?

Client Satisfaction

Client Satisfaction (Graded 0-5, 0-Very Poor : 1-Poor : 2-Satisfactory : 3-Good : 4-Very Good : 5-Excellent. )

  • Client Available?

  • Client Available
  • How does the client rate PSL for Health and Safety?

  • How does the client rate PSL for Quality?

  • How does the client rate PSL for output?

  • How does the client rate PSL for communication?

  • How does the client rate PSL's on site operatives attitude and behaviour?

  • How does the client rate PSL's site management and supervision?

  • Does the client have any issues, observations or concerns regarding PSL's activities? (Positive or Negative)

SG4

SG4

  • Can operatives describe the process for complying with SG4 requirements on site?

  • Is there evidence to suggest SG4 compliance is being observed on site? ( SG4 rails fitted, Scaff-step or other)

  • Is there suitable and sufficient equipment to permit compliance with SG4 on site?

COSHH

COSHH

  • Are operatives exposed to any chemical or substances which may pose a hazard to their health?

  • Has an adequate risk assessment been carried out covering all COSHH items on site?

  • Is PPE available on site to provide suitable protection from COSHH items?

  • Are any COSHH items respirable?

  • Are suitable dust masks or means of adequate dust suppression available for use by operatives?

  • Are operatives clean shaven to ensure correct seal of masks?

  • Have all operatives been face fit for the masks available for use on site?

  • Are all COSHH items securely stored in correct containers with labels clearly displayed?

Environmental

Environment

  • Is there risk to any flora or fauna on site from scaffolding operations?

  • Have adequate controls or precautions been implemented to prevent damage to flora / fauna?

  • Is there a risk of any leaks or spillages of any chemicals or substances?

  • Is there a spill kit or other control process on site to contain the spill?

  • Are operatives familiar with the emergency procedure to be followed in the event of a spillage on site?

Completion

Completion

  • I confirm I have had the contents of this audit report explained to me and that all non-conformances must be rectified and closed out in a timely manner.

  • Auditor

  • Manager / Supervisor

Closure

Closure

  • Manager / Supervisor

  • I confirm that all non-conformances / issues which were identified have been satisfactorily rectified and closed out.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.