Site Assessment
-
Select Site
-
Conducted on
-
Prepared by
-
Location
Section 1 - Electrical Infrastructure
1.1 Supply Infrastructure Details Substation/Transformer
-
Substation Location [Describe Location]
-
Substation Type [Pad / Pole]
-
Is the Substation shared? [yes / No / Unknown]
-
Transformer Nameplate Rating [Rating in KVA]
-
Transformer Phases [ Number of Phases]
-
Supply Fuses Rating [Rating in A if known]
-
Additional supply infrastructure comments:
1.1 TX / Substation Photo Checklist
-
1.1.1 Photos of substation location
-
1.1.2 Photos of substation nameplate
1.2 Main Switchboard Details
-
Switchboard Location [Describe location]
-
Switchboard Type [Ground / Wall-mounted / Inside / Outside ]
-
What is the approx age of the MSB
-
What is the condition of the MSB
-
Will the MSB need to be upgraded
-
MSB Fed From [ Describe upstream supply]
-
MSB Upstream Breaker [ Fuse / MCCB / MCB / Unknown ] [ Rating in Amps and kVa if known ]
-
MSB Rating [Rating in Amps / KVa]
-
MSB Busbar Chassis Rating [ Rating in Amps / KVa ]
-
SPD Rating [ Rating in Amps / KVa ]
-
Mains Cable Incoming Cable [ Cable size in mm2 ] [ Cable type and configuration ]
-
Retail Metering Setup [ Direct / CT metered ]
-
Meter NMI [ NMI number ]
-
Meter Number
-
Meter CT Rating [ Rating / Ratio in A if known ]
-
Is 4G signal available next to MSB? [ Yes / No, Number of bars on phone signal ]
-
Add screen shot of Phone Signal at MSB location
-
Is there spare space? [ Number of spare Din poles / MCCB slots ]
-
Add photos of Spare spaces
-
Additional MSB Comments: [ Insert any additional comments about the main switchboard ]
1.2 MSB Photo Checklist
-
1.2.1 Photos of MSB location
-
1.2.2 Photos of MSB nameplate
-
1.2.3 Photos of SPD / main switch (take photos of all if there is more than one)
-
1.2.4 Photos of incoming mains cabling
-
1.2.5 Photos of distribution sections / chassis (take photos of all if there is more than one)
1.3 Distribution Board / Section Details DB1 [MUST ADD 1 - Add in additional Section 1.3 if needed for additional DBs]
-
DB Name
-
DB Location [ Describe Location ]
-
DB Type: [ Ground / Wall-Mounted ]
-
DB Fed From [ Describe Upstream Supply ]
-
DB Upstream Breaker [ Fuse / MCCB / MCB / Unknown ] [ Rating in Amps and kVa ]
-
DB Board Rating [ Rating in Amps / kVa ]
-
DB Busbar Chassis Rating [ Rating in Amps / kVa ]
-
DB Main Switch Rating [ Rating in Amps / kVa ]
-
DB Incoming Cable [ Cable Size in mm2 ] [ Cable Type and Configuration ]
-
DB Is 4G signal available? [ Yes / No | Number of bars on phone signal ]
-
Add screen shot of phone signal at DB location
-
DB Is there spare space? [ Number of spare Din poles / MCCB slots ]
-
DB Additional DB Comments: [ Insert any additional comments about the distribution board / section ]
1.3 DB Photo Checklist
-
1.3.1 Photos of DB location(s) [4 Photos min]
-
1.3.2 Photos of DB nameplate(s) [4 Photos min]
-
1.3.3 Photos of Main Switch(es0 [4 Photos min]
-
1.3.4 Photos of incoming submains cabling [4 Photos min]
-
1.3.5 Photos of distribution section(s) / chassis(es) [4 Photos min]
1.4 Other Details
-
Backup Generators [ Are there backup generators, and if so, where are they located and to which board are they connected? ]
-
Where is it located?
-
Which MSB or DB is it connected to?
-
1.4.1 Photos of existing backup generator(s)
-
Fire Control [ Is there an existing FCDIE or FIP, if so, where is it located? ]
-
Where is it located?
-
1.4.2 Photos of existing Fire Indicator Panel (FIP)
-
Existing Embedded Generation [ Is there an existing solar system, and if so, what is the inverter rating and brand? ] [ Where is the location of the inverter, PV-DB (if there is one), and to which upstream board are they connected? ]
-
Inverter Rating
-
1.4.3 Photos of existing solar inverter(s)
-
Inverter Location
-
Is there a DB-PV
-
What MSB or DB is the DB-PV connected to?
-
1.4.3 Photo of DB-PV
-
Existing EV Chargers [ Are there existing EV chargers, and if so, where are they located, and what model / type / rating are they? ]
-
EV Charger Locations
-
1.4.4 Photos of existing EV charger(s) and /or EV-DB(s)
-
What Model / Type / Rating?
-
Existing Load Management System [ Is there an existing Load Management System installed, and if so, where is it located and what model is it? ]
-
Where is it located?
-
1.4.5 Photos of existing Load Management System
-
What is the Model?
-
Temporary Power Requirements [ Are there any essential / life-safety circuits on site that require backup power during any works / site shutdowns? Where are they connected? ]
-
Where are they connected?
-
What are they for?
-
Additional Comments: [ Insert any additional comments about the site infrastructure ]
1.5 Mark up options [ MUST ADD 1 - Add in additional section 1.5 if needed for additional markups ] -
Site Plans - Option 1 - Mark up directly onto the Site Plans Option 2 - Mark up free hand on Annotation form
- Option 1 - Mark up on Site Plans
- Option 2 - Free hand mark up on annotation form
-
Option 1 - Add a copy of the Marked up site plans
-
Option 2 - Complete Mark up on annotation form
1.5 Markup Checklist [Markup locations on plans]
-
Substation Location
-
Main Switchboard Location
-
Distribution Board Location(s)
-
Backup Generator Location(s)
-
Fire Indicator Panel (FIP) Location(s)
-
Existing Solar Inverter / PV-DB Location(s)
-
Existing EV Charger / EV-DB Location(s)
Section 2 – EV Charging
- 2.1 EV Charger Locations [ Add additional section if needed for more EVC locations]
-
Carpark Type [ Indoors / Outdoors / Streetside ]
-
Is carpark secure? [ Yes / No | does the carpark have some sort of locked gate or security access? ]
-
Number of Car Spaces [ How many car spaces are there? ]
-
Will Traffic Management be Required? [ Yes / No | is there traffic that needs to be manage during works? ]
-
Nearest Board [ Name of nearest board - MSB, DB to EVC ]
-
Distance to Nearest Board [ Distance in metres board to EVC]
-
Reticulation Required MSB/DB to EVC [ Surface or underground conduit / cable tray / duct, etc ]
-
Reticulation Difficulties [ Any high ceilings, concrete cutting, tree / bush removal, etc ]
-
Charger Mounting [ Wall / Ground / Pedestal / Multiple types may be required ]
-
Mechanical Protection Requirements [ Yes / No | will bollards or wheelstops be needed to prevent collison? ]
-
Are there existing chargers? [ Yes / No, number and type of chargers ]
-
Where are the existing chargers fed from? [ Name of board / supply ]
-
Is 4G signal available at EVC locations? [ Yes / No | number of bars on signal ]
-
Add screenshot of phone coverage
-
Additional DB Comments: [ Insert any additional comments about the distribution board / section ]
2.1 EV Charger location Photos [Add additional sections if needed for]
-
2.1.1 Photos of Carpark location [ multiple photos if needed ]
-
2.1.2 Photos of Cable / Reticulation Pathways(s) [multiple photos if needed]
-
2.1.3 Photos of individual car spaces and possible EVC mounting locations
2.2 Mark up options [ Add section if needed for additional markups ]
-
Site Plans - Option 1 - Mark up directly onto the Site Plans Option 2 - Mark up free hand on Annotation form
- Option 1 - Mark up on Site Plans
- Option 2 - Free hand mark up on annotation form
-
Option 1 - Add a copy of the Marked up site plans
-
Option 2 - Complete Mark up on annotation form
2.2 Markups – EV Charger Locations Checklist [ Confirm Markup location on plans ]
-
Potential EV Charger Locations
-
Nearest DBs to EV Charger Locations
-
Potential new DB-EV installation location(s)
-
Potential new cable run(s) to EV chargers / DB-EVs
-
Potential new civil works to support cable runs
Checklists
Markup Checklist
-
Markup 1: Existing Infrastructure
-
Markup 2: EV Charging Locations
Photo checklist Section 1.1 – Supply Infrastructure Details
-
1.1.1 Photos of substation location
-
1.1.2 Photos of substation nameplate
Photos checklist Section 1.2 – Main Switchboard Details
-
1.2.1 Photos of MSB location
-
1.2.2 Photos of MSB nameplate
-
1.2.3 Photos of SPD / main switch (take photos of all if there is more than one)
-
1.2.4 Photos of incoming MSB consumers mains cabling - inc cable size if possible
-
1.2.5 Photos of MSB distribution sections / chasses (take photos of all if there is more than one)
Photos checklist 1.3 – Distribution Board / Section Details
-
1.3.1 Photos of DB location(s) [4 photos min]
-
1.3.2 Photos of DB nameplate(s) [4 photos min]
-
1.3.3 Photos of DB main switch(es) [4 photos min]
-
1.3.4 Photos of incoming DB submains cabling [4 photos min]
-
1.3.5 Photos of DB distribution section(s) / chassis(es) [4 photos min]
Photos checklist Section 1.4 – Other Details
-
1.4.1 Photos of existing backup generator(s)
-
1.4.2 Photos of existing Fire Indicator Panel (FIP)
-
1.4.3 Photos of existing solar inverter(s) and / or PV-DB(s)
-
1.4.4 Photos of Existing EV Chargers and EV-DBs
-
1.4.5 Photos of Existing Energy Load Management System
Photo Checklist Section 2.1 EV Charger Locations
-
2.1.1 Photos of Carpark location [ multiple photos if needed ]
-
2.1.2 Photos of Cable / Reticulation Pathways(s) [ multiple photos if needed ]
-
2.1.3 Photos of individual car spaces and possible EVC mounting locations