Information

  • Audit and Asset Capture - OT

  • Document No.

  • OT Site Names

  • On-Site Contact

  • Conducted on

  • Prepared by

  • Location

Audit and Asset Capture - Electrical - Block A

Electrical inspection of the site and capturing switchboard and EML asset details

  • 1A - Main Switchboard

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 2A - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 3A - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 4A - Lighting Control Panel

  • Approx. age of the panel?

  • Location of the panel?

  • Are all of the controls working correctly?

  • What issues are present?

  • 5A - Changeover Switch

  • Approx. age of the switch?

  • Location of the switch?

  • Is the switch operating correctly?

  • What is the issue?

  • 6A - Emergency and Exit Lights

  • Number of units?

  • Make and Model of the units

  • Are all of the units within the area in the same location as marked on the AS Builts?

  • Which units are in a different location?

  • Approx. age of the unit?

  • Condition of the unit?

  • Why this condition?

  • 7A - General Lighting

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 8A - General Lighting (2)

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 9A - Flood lights (turn on)

  • Are all flood lights working correctly?

  • How many are affected and what is the issue?

  • Approx. age of the units?

  • Type of flood lights?

  • Condition of the units?

  • Why this condition?

  • 10A - Are multiboxes and/double adaptors being used around the tenancy? (only review 5 max)

  • Are they overloaded?

Audit and Asset Capture - Electrical - Block B

Electrical inspection of the site and capturing switchboard and EML asset details

  • 1BE - Main Switchboard

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 2BE - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 3BE - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 4BE - Lighting Control Panel

  • Approx. age of the panel?

  • Location of the panel?

  • Are all of the controls working correctly?

  • What issues are present?

  • 5BE - Changeover Switch

  • Approx. age of the switch?

  • Location of the switch?

  • Is the switch operating correctly?

  • What is the issue?

  • 6BE - Emergency and Exit Lights

  • Number of units?

  • Make and Model of the units

  • Are all of the units within the area in the same location as marked on the AS Builts?

  • Which units are in a different location?

  • Approx. age of the unit?

  • Condition of the unit?

  • Why this condition?

  • 7BE - General Lighting

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 8BE - General Lighting (2)

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 9BE - Flood lights (turn on)

  • Are all flood lights working correctly?

  • How many are affected and what is the issue?

  • Approx. age of the units?

  • Type of flood lights?

  • Condition of the units?

  • Why this condition?

  • 10BE - Are multiboxes and/double adaptors being used around the tenancy? (only review 5 max)

  • Are they overloaded?

Audit and Asset Capture - Electrical - Block C

Electrical inspection of the site and capturing switchboard and EML asset details

  • 1BW - Main Switchboard

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 2BW - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 3BW - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 4BW - Lighting Control Panel

  • Approx. age of the panel?

  • Location of the panel?

  • Are all of the controls working correctly?

  • What issues are present?

  • 5BW - Changeover Switch

  • Approx. age of the switch?

  • Location of the switch?

  • Is the switch operating correctly?

  • What is the issue?

  • 6BW - Emergency and Exit Lights

  • Number of units?

  • Make and Model of the units

  • Are all of the units within the area in the same location as marked on the AS Builts?

  • Which units are in a different location?

  • Approx. age of the unit?

  • Condition of the unit?

  • Why this condition?

  • 7BW - General Lighting

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 8BW - General Lighting (2)

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 9BW - Flood lights (turn on)

  • Are all flood lights working correctly?

  • How many are affected and what is the issue?

  • Approx. age of the units?

  • Type of flood lights?

  • Condition of the units?

  • Why this condition?

  • 10BW - Are multiboxes and/double adaptors being used around the tenancy? (only review 5 max)

  • Are they overloaded?

Audit and Asset Capture - Electrical - Block D

Electrical inspection of the site and capturing switchboard and EML asset details

  • 1C - Main Switchboard

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 2C - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 3C - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 4C - Lighting Control Panel

  • Approx. age of the panel?

  • Location of the panel?

  • Are all of the controls working correctly?

  • What issues are present?

  • 5C - Changeover Switch

  • Approx. age of the switch?

  • Location of the switch?

  • Is the switch operating correctly?

  • What is the issue?

  • 6C - Emergency and Exit Lights

  • Number of units?

  • Make and Model of the units

  • Are all of the units within the area in the same location as marked on the AS Builts?

  • Which units are in a different location?

  • Approx. age of the unit?

  • Condition of the unit?

  • Why this condition?

  • 7C - General Lighting

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 8C - General Lighting (2)

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 9C - Flood lights (turn on)

  • Are all flood lights working correctly?

  • How many are affected and what is the issue?

  • Approx. age of the units?

  • Type of flood lights?

  • Condition of the units?

  • Why this condition?

  • 10C - Are multiboxes and/double adaptors being used around the tenancy? (only review 5 max)

  • Are they overloaded?

Audit and Asset Capture - Electrical - Block E

Electrical inspection of the site and capturing switchboard and EML asset details

  • 1D - Main Switchboard

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 2D - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 3D - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 4D - Lighting Control Panel

  • Approx. age of the panel?

  • Location of the panel?

  • Are all of the controls working correctly?

  • What issues are present?

  • 5D - Changeover Switch

  • Approx. age of the switch?

  • Location of the switch?

  • Is the switch operating correctly?

  • What is the issue?

  • 6D - Emergency and Exit Lights

  • Number of units?

  • Make and Model of the units

  • Are all of the units within the area in the same location as marked on the AS Builts?

  • Which units are in a different location?

  • Approx. age of the unit?

  • Condition of the unit?

  • Why this condition?

  • 7D - General Lighting

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 8D - General Lighting (2)

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 9D - Flood lights (turn on)

  • Are all flood lights working correctly?

  • How many are affected and what is the issue?

  • Approx. age of the units?

  • Type of flood lights?

  • Condition of the units?

  • Why this condition?

  • 10D - Are multiboxes and/double adaptors being used around the tenancy? (only review 5 max)

  • Are they overloaded?

Audit and Asset Capture - Electrical - Block F

Electrical inspection of the site and capturing switchboard and EML asset details

  • 1E - Main Switchboard

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 2E - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 3E - Sub board

  • Size (Amps and phases)

  • Approx. age of the board?

  • Are there any RCDs in place?

  • Location of the board?

  • Are there any unsealed fire penetrations from the switchboard supplies?

  • Any visible risks linked to the board?

  • What issues are present?

  • 4E - Lighting Control Panel

  • Approx. age of the panel?

  • Location of the panel?

  • Are all of the controls working correctly?

  • What issues are present?

  • 5E - Changeover Switch

  • Approx. age of the switch?

  • Location of the switch?

  • Is the switch operating correctly?

  • What is the issue?

  • 6E - Emergency and Exit Lights

  • Number of units?

  • Make and Model of the units

  • Are all of the units within the area in the same location as marked on the AS Builts?

  • Which units are in a different location?

  • Approx. age of the unit?

  • Condition of the unit?

  • Why this condition?

  • 7E - General Lighting

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 8E - General Lighting (2)

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Is the lighting diffusers/lenses clean and undamaged?

  • What is the issue?

  • Condition of the units?

  • Why this condition?

  • 9E - Flood lights (turn on)

  • Are all flood lights working correctly?

  • How many are affected and what is the issue?

  • Approx. age of the units?

  • Type of flood lights?

  • Condition of the units?

  • Why this condition?

  • 10E - Are multiboxes and/double adaptors being used around the tenancy? (only review 5 max)

  • Are they overloaded?

Audit and Asset Capture - Electrical - Main Court Yard

Electrical inspection of the site and capturing switchboard and EML asset details

  • 1F - Ground Lighting

  • Are there any blown or flickering lights?

  • How many lights are affected?

  • Approx. age of the units?

  • Condition of the units?

  • Why this condition?

  • 2F - Flood lights (turn on)

  • Are all flood lights working correctly?

  • How many are affected and what is the issue?

  • Approx. age of the units?

  • Type of flood lights?

  • Condition of the units?

  • Why this condition?

Audit and Asset Capture - Additional

Other Hazards

  • Please make a note of any hazards not already identified in this report.

  • From the site review, what everything up to code?

  • What issues were found?

General Comment

  • Please make a note of any issues not already identified in this report.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.