Title Page
-
Site Name
-
Document No.
-
Conducted on
-
Site Location
-
Principal Contractor
-
Prepared by
-
Attended by
Site Review
-
Tasks being undertaken at the time of Site Inspection?
-
Are Critical Activities being undertaken?
-
Document Critical Activities and controls implemented
-
Safety issues identified onsite?
-
Document site safety issues
-
Safety issue rectified at the time of visit
-
How was this rectified?
-
How will this be rectified?
-
Has a CSI been conducted?
-
CSI Attendees
-
Has there been safety engagement with the PC Sub Contractors?
-
List Sub Contractor attendees
-
Has there been a good practice identified?
-
Document the good practice identified
-
Media
-
Drawings
-
Notes:
-
Signiture