Title Page
-
Conducted on
-
Location
-
Site Address
-
Select Suburb
- Alexandria
- Annadale
- Barangaroo
- Beaconsfield
- Camperdown
- Centennial Park
- Chippendale
- Darlinghurst
- Darlington
- Dawes Point
- Elizabeth Bay
- Erskinneville
- Eveleigh
- Forest Lodge
- Glebe
- Haymarket
- Millers Point
- Moore Park
- Newtown
- Paddington
- Potts Point
- Pyrmont
- Redfern
- Rosebery
- Rushcutters Bay
- Surry Hills
- Sydney CBD
- The Rocks
- Ultimo
- Waterloo
- Woolloomooloo
- Zetland
-
Is this a PCA work?
-
All these details can be found in DA Referral Letter.
-
Enter PCA (P) File No.
-
Enter Public Domain (S) File No.
-
Enter Development Application (DA) No.
-
Enter Construction Certificate (CC) No.
-
Select Inspection Type
- FOOTWAY
- KERB AND GUTTER
- LIGHTING
- PARKS
- SINGS AND PAVEMENT MARKING
- PEDESTRIAN RAMP
- RAINGARDENS
- REMEDIATION WORKS
- RETAINING WALLS
- ROAD PAVEMENT
- SOFT LANDSCAPING AND TREES
- DRAINAGE PIT
- DRAINAGE PIPE
- DRAINAGE CULVERT
- STREET FURNITURE
- VEHICULAR CROSSING
- FINAL INSPECTION
-
Select Footpath Type
-
Select Hold Point
- Excavation to the subbase
- Compaction of subgrade
- Placement and Compaction of DGB20
- Set Out for Crossfall
- Reinforcements
- Bedding layer for Pavers
- Expansion and Contraction Joints
- Finished Concrete
- Finished Paver
- Finished Asphalt
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Drainage Pit Setout
- Excavation for Pit
- Placement and Compaction of Bedding
- Formwork and Reinforcement
- Grate/Lid Installation
- Lintel Installation
-
Please take photos
-
Inspection Passed?
-
Why failed?
-
Select Hold Point
- Kerb Setout
- Compaction of Subgrade
- Placement and Compaction of DGB20 Base
- Road Restoration in Front of Gutter
- Cutting Drainage Outlet
- Concrete Base for Stone Kerb
- Installation of Stone Kerb
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Pipe Set Out
- Excavation of Trench
- Placement and Compaction of Bedding
- Placement of Pipe
- Connection to Pits
- Placement and Compaction of Subsurface Drainage and Backfill
- Culvert Setout
- Culvert Base
- Cast In-situ Culvert
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Proof Roll Subgrade
- Proof Roll Subbase DGS40
- Proof Roll Base DGB20
- Placement of Concrete Base
- Sprayed Bituminous Surfacing
- Placement of Asphalt
- Finished Asphalt Road
- Formwork and Reinforcement for Rigid Road
- Finished Concrete Road
-
Inspection Passed?
-
Why failed?
-
If No, Please Comment
-
Select Hold Point
- Set out and approval of Lighting Location
- Excavation of footing
- Subgrade and base to finish level
- Erection of formwork and reinforcement
- Placement of concrete in footing
- Laying of conduits
- Fixing of lights
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Excavation of softfall area prior to installing softfall material
- Installed play equipments prior to backfilling or softfall installation
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Compaction of subgrade
- Compaction of subbase DGB20
- Concrete formwork and reinforcement
- Placement of concrete
- Finished kerb ramp
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Compaction of Subgrade
- Placement and compaction of DGB20
- Set out including thickness and reinforcement
- Placement of concrete
- Finished Vehicular Crossing
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Excavation for raingarden
- Placement of liner
- Placement of slotted drains
- Placement of drainage layer
- Placement of transition layer
- Placement of bio-filtration layer
- Installation of dissapation rocks
- Installation of plants
- Placement of gravel mulch
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Inspection of all trees stock greater than 75L prior to planting
- Excaved tree pits prior to backfill and planting
- AG lines in place prior to backfilling
- Inspection of structural soils and/or strata cells
- Installation of plants and trees
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Setout and approval of all furniture locations prior to fixing
- Excavation of footings
- Erection of formwaor and reinforcements for footings
- Subgrade and base to finish levels
- Fixing of furniture
- Inspection of tactiles
- Inspection of bollards
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Pavement Marking setout
- Removal of pavement marking
- Application of pavement marking
- Application of raised pavement markers
- Sign post setout
- Construciton of footings
- Installation of posts
- Installation of signs
- Installation of signsontoany structure other than poles
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Retaining Wall setout
- Excavation of footing
- Compaction of subgrade and base to finish levels
- Erection of formwork and reinforcement for footings
- Placement of concrete in the footing
- Wall completion
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Select Hold Point
- Inspection of Remediation layer prior to backfill of selective fill
- Inspection of marker layer prior to backfill of selective fill
-
Inspection Passed?
-
Why failed?
-
Please take photos
-
Is there any defects?
-
List of defects
-
Please ensure to list all the defects and take photos of all defects.
-
Please take photos
-
Please ensure to take photos of completed public domain works.
-
Please take photos
-
Additional Comments/Instructions
-
Inspecting Offer to save the completed inspection sheet into the relevant TRIM folder
-
Developer Representative
-
Inspection Officer (CoS Representative)