Information
-
Location:
-
General Contractor:
-
Store Number
-
Electrical Contractor
-
Conducted on
-
Person performing inspection:
Sales Floor
-
-
Are F/A Sec. devices roughed in correctly?
-
Are fixtures tied off with 2 grid wires?
-
Are all j-box's closed?
-
Is all temporary power removed?
-
Additional information,comments,concerns or photos about this area?
-
Are there any delays in this area?
-
Photograph of area
Pharmacy
-
Are F/A Sec. devices roughed in correctly?
-
Are lights layed out correctly?<br>
-
Are boxes roughed In at proper height and location per detail drawings?
-
Is door chime installed correctly?
-
Drive through intercom?
-
Additional information,comments,concerns or photos about this area?
-
Are there any delays in this area?
-
Photograph of area
Office/front area
-
Are F/A Sec. devices roughed in correctly?
-
Are fixtures tied off with 2 grid wires?
-
Are all j- box's closed?
-
Is all temporary power removed?
-
Are boxes roughed In at proper height and location per detail drawings?
-
Mgr. override switch?
-
Is the CER roughed in correctly?
-
Is Genn. Annunciator box installed?
-
Are restroom can lights in per drawing?
-
Are box's supported properly?
-
Are the proper plaster rings used?
-
Additional information,comments,concerns or photos about this area?
-
Are there any delays in this area?
-
Photograph of area
Meat,Seafood,Produce prep.
-
Are F/A Sec. devices roughed in correctly?
-
Are all j-box's closed?
-
Is all temporary power removed?
-
Are boxes roughed In at proper height and location per detail drawings?
-
Are Meat/Seafood drops laid out correctly?
-
Additional information,comments,concerns or photos about this area?
-
Are there any delays in this area?
-
Photograph of area
Back/stock room
-
Are F/A Sec. devices roughed in correctly?
-
Are boxes roughed In at proper height and location per detail drawings?
-
Additional information,comments,concerns or photos about this area?
-
Are there any delays in this area?
-
Photograph of area
Additional Comments and Photographs
-
Was the contractor notified of items not in compliance before leaving the site?
-
What is the date set for correction of items that are not in compliance?
-
When will the contractor be notified of non-compliance items?
-
Additional Comments and Photographs
Comment
-
-