Title Page
-
Project Name/ Number
-
Project Location
-
Project Manager
-
Project Engineer
-
Supervisor/ Foreman
-
Number of Employees
-
Conducted on
-
Prepared by
General Assessment
Hazard Communication
-
SDS and Chemical lists maintained on site
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Has SDS and Chemical list been updated for new products?
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Proper identification labels on cans/ portable containers
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Housekeeping
-
Proper rebar caps used to eliminate impalement
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Work areas clean of excess construction debris
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Nails pulled from wood before handling
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Proper storage of materials, supplies, and equipment (Gangbox, Sea Box, etc.)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Proper walkway maintained (ice, oil, chords, airlines, etc.)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Job Site Requirements
-
Emergency Action Plan posted
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
First aid / Eye wash / Bloodborne Kits available & maintained
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
OSHA (5 in 1) minimum wage, discrimination, state posters
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Public/ Other Worker Protection
-
Pedestrian signs; barriers; fences; gates; flagging
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Pedestrian walkways protected from trip and slip hazards
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Dust curtains are taped W/ doors and access areas
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Life rings, 90 feet of rope and air horn near water hazards
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Open holes covered and secured and/or barricaded with fencing or guardrails
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Overhead protection (falling; flying debris; tool and equipment)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Property's glass; tile; flooring and vehicles protected
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Traffic controls maintained (signs, direction, barricades)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Safety Culture
-
Project planning documents onsite and have been reviewed with employees
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Task Planning completed for unidentified or new tasks
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Project is utilizing safety culture programs (i.e. Safety 24/7, Frontline Safety, Mentoring Programs)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Sanitation
-
Drinking water is available
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
If not using bottled water, are drinking coolers properly maintained, sanitized, and labeled
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Proper means of disposal (dumpsters, trash cans)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Proper number of toilets and wash-up facility provided
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Commercial (Non-Elevated)
Aerial Lifts: (Articulated, Scissor)
-
Area around swing radius is properly barricaded
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Workplace hazards identified before use
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Employees maintaining fall protection attachment(s)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Railings not used for work access
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Stable, level drive area
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Equipment not used as a crane to lift materials
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Compressed Air and Gas Cylinder Safety
-
Air compressors properly maintained and used
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
All connections are double pinned with whip check installed
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Compressed air receiver tanks equipped with blow off valve
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Threaded connection for airlines (2" or greater)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
OSHA valves installed on 1/2" or greater inside diameter hose (3/4" outside diameter or greater)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Compressed gas cylinders stored and secured vertically
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Cylinders have caps installed when not in use
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Flash back arresters installed at cylinder regulator
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Oxygen and fuel gases stored 20' apart or separated by fire proof wall
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Electrical Safety
-
Adequate lighting for work areas (guarded lenses)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Assured grounding inspection or GFCI is in use
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Electric panel boxes have proper covers
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Extension cords are 12 gauge/ 3 wire minimum
-
Comments:
-
Due Date:
-
Action Completed:
-
Person Assigned:
-
Comments:
Fall Protection
-
Anchor point of 5000 lbs. per employee or engineered anchorage
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Floor and walkway openings protected
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Employees are maintaining 100% fall protection program
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Vertical and/or horizontal life lines properly installed and inspected
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Handrails are properly constructed- top middle and toe board
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
Fire Safety
-
Equipment turned off while fueling
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Exit, stairs, and walkways are clear (36" minimum walkway)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Fire extinguishers are of adequate size and placement (10 lb. min.)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Flammable storage area is 20' from buildings
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Flammables and combustibles stored separately
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Fuels cans no larger than 5 gallon with flash arrestor/ spring locks
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Fuel storage area: signs/ containment/ >20 lbs. extinguisher
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
No smoking signs posted (smoking areas clearly marked)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Oily rags stored in proper container W/ self closing lid
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Welding/ burning: No combustibles/ fire extinguisher present
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Hot work permit in use (when required)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
Hand Tools and Power Equipment
-
Power equipment clean and free of damage
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Grinders used with guards and side handles at all times
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Hand tools maintained and free of damage
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Hand tools secured from falling (working at heights)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Power tools are double insulated with proper grounding connection
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Running equipment not left unattended
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Sand pots: properly used, clean, and free of damage
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Pressure washers: properly used, clean, and free of damage
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Saws: properly used, clean and free of damage
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
Lock-Out/ Tag-Out Program
-
Energy isolation devices identified and secured
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Group lock-out box in use with supervisor's lock in place
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Individual employee locks are labeled and in use
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Lock-out point has a "Do Not Operate" tag attached
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Written program in place (company or client provided)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Tags are completely filled out
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
Motorized Equip. (Forklift; Con. Buggie; Skid Steer)
-
Equipment inspection completed before use (daily)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Lift is used within rated capacity
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Attachments inspected and manufactured for intended use
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
Mixing/ Grouting/ Gunite Equipment
-
Dust containments are established in public areas
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Employees are wearing correct PPE for identified tasks
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Equipment is shut down for cleaning (LO/TO where needed)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Machines are maintained and appear to be fully operational
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Material placement does not create tripping hazards
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Team lifting practices for bags (50 lb. or greater)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
Personal Protective Equipment
-
Chemical Protective Clothing (Tyvek, Rain Suits, Etc.)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Hard hats are being worn properly and are in good condition
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Eye protection (Z-87.1+ and rated for Task)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Flotation devices (PFD- Personal Flotation Device)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Appropriate gloves for the identified task
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Hearing Protection (Noise levels greater than 85 dB)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Work Boots: Leather / Safety Toe (Steel or Composite)
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
-
Reflective Clothing/ Vests- As determined by project
-
Comments:
-
Date Due:
-
Action Completed:
-
Comments:
-
Person Assigned:
Respiratory Protection
-
All airborne (respiratory hazards) have been identified
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Employees are clean shaven when using respiratory protection
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Fitted respirator users trained, provided physicals, and fit tested
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Proper respiratory protection has been selected for hazards
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Respiratory cleaning/ disinfection supplies provided
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Respirators are stored in protective bags when not in use
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Respirators are being worn properly
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Structure Safety and Protection
-
Has shoring been properly implemented and maintained
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Is loose and delaminated concrete removed prior to working
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Is shoring left in place until completion of proper cure time
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Is shoring placed around columns when concrete removed
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Is structure capable of supporting construction equipment and debris
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Is there point loading of materials or debris on elevated decks
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Scaffold And Ladder Access
-
Ladder tip extends 36" beyond landing area
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Ladders are inspected daily and in good working condition
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Ladders are installed with 4:1 standard ratio
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Ladders are secured before employee work begins
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Ladders are non-conductive and have non-skid feet
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Scaffold has adequate cross bracing with positive locking devices
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Scaffold modifications made by competent person only
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Scaffolding system is properly tagged and inspected
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Work decks are secured to scaffolding and free of debris
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Work decks are complete without spacing/ openings
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Storage (equipment/ Supplies)
-
Protected from vehicle and pedestrian traffic
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Secure area (fencing or other enclosure) off hours
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Flammable cabinets are in use (20 gal or greater)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Equipment is barricaded while being operated
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Traffic Control (Active Garages)
-
Barricades for equipment, men working, etc.
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Traffic lanes well marked
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Blind spots are identified
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Pedestrian walkways are clearly marked/ barricaded
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Adequate lighting provide for pedestrian walk ways
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Adequate lighting for work crews
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Work crews is using type- II reflective clothing
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
Trenching/ Excavation Safety
-
Competent person evaluating: shoring, benching, sloping
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Excavation access are properly guarded at ground level
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Excavation is being monitored for gases (greater than 4' deep)
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Ladder access provided (min. 25' travel distance) for entry and exits
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments:
-
Shoring devices are engineered and in good working condition
-
Comments:
-
Date Due:
-
Action Completed:
-
Person Assigned:
-
Comments: