iAuditor Mobile App Preview

Inspection

Site

Inspect asphalt; check slope for proper drainage (no puddles)

Inspect asphalt; check slope for proper drainage (no puddles)

Inspect grounds

Inspect fencing and gate; ensure correct operation of gate (full swing)

Inspect fence posts and fabric for correct material (vinyl coated black or brown)

Ensure that all debris has been removed from site

Wetwell

Inspect interior coating (cracks, blisters, loose material, exposed concrete, etc.)

Inspect exterior coating (coal-tar epoxy)

Ensure that stainless steel bolts are utilized in ductile iron piping

Inspect concrete penetrations (discharge piping, conduits, etc.)

Ensure that all penetrations are cored and link-sealed, then finished with epoxy grout

Check proper operation of aluminum hatch and placement per approved design

Check and verify opening of hatch to accommodate pump extraction

Verify all required signage has been provided (Confined Space, OSHA, etc.)

Verify operating range of (bubbler and/or floats) per approved design

Inspect alignment of discharge piping

Inspect paint used on piping

Inspect alignment of poly ladder rungs, ladder placement, and ladder mast bracket

Pumps

Pull each pump and reset; check for ease of removal, alignment of rails and proper sealing at disconnect flange

Inspect for any damage to paint on pump

Inspect cord and cord placement

Valve Vault

Inspect interior coating (cracks, blisters, loose material, exposed concrete, etc.)

Inspect paint on all mechanical piping (cracks, blisters, loose paint)

Inspect alignment of discharge piping

Verify pressure gauges are in place and the correct type

Check and verify opening of hatch

Verify all required signage has been provided (Confined Space, OSHA, etc.)

Ensure drain line is at grade from valve vault to wetwell

Piping

Ensure alignment of discharge piping between wetwell and valve vault

Electrical

Verify that seal-offs are sealed with sealing compound

Verify that pump motor leads are a continuous run from pump to control panel

Verify the usage of stainless steel strain reliefs on all pump and float cords

Verify that bubbler line is sealed off in conduit

Verify seal-offs are located in vault, and that all conduit penetrations are grouted

Verify that there has been a signed, approved electrical inspection report

Ensure that ground rods are accessible and have risers installed for access per specification

Control Panel

Ensure that wiring schematic is in door pocket

Ensure that "control" side of panel is oriented facing the wetwell

Verify UL labeling

Inspect enclosure for chipped paint or other damage

Utilize mil-thickness gauge to verify proper DFT per specification

Verify signed-off electrical inspection report from governing electrical inspector

Verify all pilot lights are operational

Verify all wires are labeled

Verify all placards are in place

Verify all wiring debris has been removed from enclosure

General inspection of field wiring

Conduct operation test of controls

Pump manufacturer to supply additional motor nameplates (crew to place on interior door)

Specialty products mounted and placed in interior of control panel

Telemetry System

Visually verify all components have been provided and pre-wired (radio, antenna, all associated wiring, alarm points, etc.)

Check communication link to base station

Inspect field wiring

Ensure that standard mast and antenna are supplied (standard anchoring method)

Operations Test - Pump System

Ensure contractor and contractor's representatives are present during start-up (electrician, control panel manufacturer, pump manufacturer, mechanical, etc. - generator manufacturer optional)

Verify pump rotation, reverse leads if necessary

Throttle valves while filling force main, if applicable

Draw-Down Test - Calculate actual GPM and compare to design specifications (check both pumps)

Add water to system and/or simulate flow; confirm operation of liquid level control system

Inspect sealing flange of pump for proper seal (no leaks)

Pull pumps and extract from wetwell; ensure clearances are maintained and pumps travel smoothly

on rail system; check pump cords for obvious obstructions

Test "high-water" and "low-water" alarms

Note any unusual noises/vibration

Operations Test - Generator

Verify diesel tank is fully fueled after manufacturer's representative has performed load run

Run generator in "manual" mode; check hertz, voltage, etc; verify operation of load bank

Verify certified affidavit of start-up and load testing from manufacturer's representative

Receipt of manufacturer's warranty (2-year)

Test "auto shut-down" on overspeed circuit

Test to see of genset meets decibel requirements of specifications

Simulate power failure (disconnect main breaker); verify automatic start of genset

Verify automatic transfer of power to emergency source; check for proper time delay between sequences

Let run for ten (10) minutes

Restore utility power source; verify automatic transfer, cool-down cycle time, and shut down

Test load bank for proper operation

Ensure that separate circuits are provided for battery charger and block heater

Test block heater and battery charge for proper operation

Completion

Comments

Inspector Name and Signature

Pump Maintenance Checklist (station Inspection)

Created by: SafetyCulture Staff | Industry: General | Downloads: 18

A pump maintenance checklist is a tool used by pump technicians or engineers when conducting pump inspections. Pump inspection checklists guide inspectors during pump inspections to help ensure that the pumps are in good working condition. Inspectors can use this digitized checklist to help prevent unscheduled disruptions by inspecting pump stations.

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Inspection

Site

Inspect asphalt; check slope for proper drainage (no puddles)

Inspect asphalt; check slope for proper drainage (no puddles)

Inspect grounds

Inspect fencing and gate; ensure correct operation of gate (full swing)

Inspect fence posts and fabric for correct material (vinyl coated black or brown)

Ensure that all debris has been removed from site

Wetwell

Inspect interior coating (cracks, blisters, loose material, exposed concrete, etc.)

Inspect exterior coating (coal-tar epoxy)

Ensure that stainless steel bolts are utilized in ductile iron piping

Inspect concrete penetrations (discharge piping, conduits, etc.)

Ensure that all penetrations are cored and link-sealed, then finished with epoxy grout

Check proper operation of aluminum hatch and placement per approved design

Check and verify opening of hatch to accommodate pump extraction

Verify all required signage has been provided (Confined Space, OSHA, etc.)

Verify operating range of (bubbler and/or floats) per approved design

Inspect alignment of discharge piping

Inspect paint used on piping

Inspect alignment of poly ladder rungs, ladder placement, and ladder mast bracket

Pumps

Pull each pump and reset; check for ease of removal, alignment of rails and proper sealing at disconnect flange

Inspect for any damage to paint on pump

Inspect cord and cord placement

Valve Vault

Inspect interior coating (cracks, blisters, loose material, exposed concrete, etc.)

Inspect paint on all mechanical piping (cracks, blisters, loose paint)

Inspect alignment of discharge piping

Verify pressure gauges are in place and the correct type

Check and verify opening of hatch

Verify all required signage has been provided (Confined Space, OSHA, etc.)

Ensure drain line is at grade from valve vault to wetwell

Piping

Ensure alignment of discharge piping between wetwell and valve vault

Electrical

Verify that seal-offs are sealed with sealing compound

Verify that pump motor leads are a continuous run from pump to control panel

Verify the usage of stainless steel strain reliefs on all pump and float cords

Verify that bubbler line is sealed off in conduit

Verify seal-offs are located in vault, and that all conduit penetrations are grouted

Verify that there has been a signed, approved electrical inspection report

Ensure that ground rods are accessible and have risers installed for access per specification

Control Panel

Ensure that wiring schematic is in door pocket

Ensure that "control" side of panel is oriented facing the wetwell

Verify UL labeling

Inspect enclosure for chipped paint or other damage

Utilize mil-thickness gauge to verify proper DFT per specification

Verify signed-off electrical inspection report from governing electrical inspector

Verify all pilot lights are operational

Verify all wires are labeled

Verify all placards are in place

Verify all wiring debris has been removed from enclosure

General inspection of field wiring

Conduct operation test of controls

Pump manufacturer to supply additional motor nameplates (crew to place on interior door)

Specialty products mounted and placed in interior of control panel

Telemetry System

Visually verify all components have been provided and pre-wired (radio, antenna, all associated wiring, alarm points, etc.)

Check communication link to base station

Inspect field wiring

Ensure that standard mast and antenna are supplied (standard anchoring method)

Operations Test - Pump System

Ensure contractor and contractor's representatives are present during start-up (electrician, control panel manufacturer, pump manufacturer, mechanical, etc. - generator manufacturer optional)

Verify pump rotation, reverse leads if necessary

Throttle valves while filling force main, if applicable

Draw-Down Test - Calculate actual GPM and compare to design specifications (check both pumps)

Add water to system and/or simulate flow; confirm operation of liquid level control system

Inspect sealing flange of pump for proper seal (no leaks)

Pull pumps and extract from wetwell; ensure clearances are maintained and pumps travel smoothly

on rail system; check pump cords for obvious obstructions

Test "high-water" and "low-water" alarms

Note any unusual noises/vibration

Operations Test - Generator

Verify diesel tank is fully fueled after manufacturer's representative has performed load run

Run generator in "manual" mode; check hertz, voltage, etc; verify operation of load bank

Verify certified affidavit of start-up and load testing from manufacturer's representative

Receipt of manufacturer's warranty (2-year)

Test "auto shut-down" on overspeed circuit

Test to see of genset meets decibel requirements of specifications

Simulate power failure (disconnect main breaker); verify automatic start of genset

Verify automatic transfer of power to emergency source; check for proper time delay between sequences

Let run for ten (10) minutes

Restore utility power source; verify automatic transfer, cool-down cycle time, and shut down

Test load bank for proper operation

Ensure that separate circuits are provided for battery charger and block heater

Test block heater and battery charge for proper operation

Completion

Comments

Inspector Name and Signature