Information
-
Job No.
-
Job Name
-
Equipment Tag
-
Conducted on
-
Prepared by
-
Location
General Information
Project Background
-
Equipment
-
Equipment Tag
Pump Information
-
Pump Manufacturer
-
Pump Model
-
Pump Serial Number
-
Pump Nameplate (GPM/Head)
-
Pump Nameplate
-
Pump
Motor Information
-
Motor Manufacturer
-
Motor Model
-
Motor Serial Number
-
Motor Nameplate
General Installation
-
Vendor prestart inspection performed
-
Test reports turned in & documented
-
Manufacturers start up requirements reviewed
-
Specification reviewed
-
Contract detail reviewed
-
Physical installation complete
-
Seismic restraint complete<br>
-
Equipment has proper tagging/ identification
-
Electrical clearances verified
-
Mounting checked (shipping bolts removed)
-
Vibration isolators installed<br>
-
Piping & Valves Completed & Tested<br>
-
Pump(s) Rotates Freely<br>
-
Alignment, Lubrication Completed<br>
-
Access to control panel adequate<br>
Pre-Startup Controls Inspection
-
Control system wiring complete<br>
-
Control system is operational <br>
-
Control interlocks and safeties operational<br>
-
Ready to start and run under control<br>
Pre Start-Up Electrical
-
Electrical clearances verified
-
Electrical connections tight and complete<br>
-
Power disconnects installed and labeled.<br>
-
Safeties installed and operational<br>
-
Proper grounding installed as required.<br>
-
Starter overload breakers installed and are of correct size<br>
Start-Up Inspection
-
Pump Rotation Correct (Bump)<br>
-
Electrical Interlocks Verified<br>
-
Vibration & Noise Level Acceptable<br>
-
O&M manual available<br>
-
Motor Amps within Range
-
Rated
-
Actual
-
Motor Volts within Range
-
Rated
-
Actual