Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel / Trades
Exterior
-
Roof works
-
Brick repairs
-
Exterior paint
-
Glazing & Putty
-
Paths
-
Drive
-
Trees & vegetation
-
Fencing
Electrical
-
Electrical COC received
-
RCD installed for new circuits
-
New electrical outlets installed in correct locations
-
Check roof space that wiring is correctly run and secured
Laundry
-
Walls
-
Ceilng
-
Window
-
Door
-
Floor
Toilet
-
Walls
-
Ceiling
-
Window
-
Door
-
Floor
-
Toilet and cistern
Bathroom
-
Walls
-
Ceiling
-
Window
-
Door
-
Floor
-
Hardiglaze walls
-
Hardiglaze ceiling
-
Ventilation
-
Moonlight
-
Vanity / bath / taps
Hall / Entry
-
Walls
-
Ceiling
-
Doors
-
Floor
-
Smoke alarm
Bedrooms
-
Other
B1
-
Walls
-
Ceiling
-
Windows
-
Doors
-
Floor
-
Curtains
B2
-
Walls
-
Ceiling
-
Windows
-
Doors
-
Floor
-
Curtains
B3
-
Walls
-
Ceiling
-
Windows
-
Doors
-
Floor
-
Curtains
B4
-
Walls
-
Ceiling
-
Windows
-
Doors
-
Floor
-
Curtains
B5
-
Walls
-
Ceiling
-
Windows
-
Doors
-
Floor
-
Curtains
Kitchen
-
Walls
-
Ceiling<br>
-
Windows
-
Doors
-
Floor
-
Paint to cupboards checked, all edges painted
-
Range hood / ventilation installed correctly. Check ducting and operation
Dining
-
Walls
-
Ceiling
-
Windows
-
Doors
-
Floor
-
Curtains
Living
-
Walls
-
Ceiling
-
Windows
-
Doors
-
Floor
-
Curtains
-
Heating
General
-
List variation items to be submitted
-
Add drawing