Information

  • Client / Site

  • Conducted on

  • Prepared by

  • Unit

General

  • ADDC Permanent Power Supply Connected

  • ADDC Permanent Water supply Connected

  • NCR and SOR closeout completed

  • Consultant snags Reports completed

  • Final Testing and Commissioning completed and T&C Reports for all systems provided

  • Warranties certificates, O&M and As built drawings are provided from Contractor<br>

  • Smoke/heat detectors are functional<br>

  • All services clearly labelled (Pipes, Cable trays, Cables etc..)<br>

  • 3 Keys set provided for all rooms<br>

  • All ducting are sealed with fire sealants and tagged<br>

  • Access panels are functional and adequate for accessing assets/services<br>

  • Cooker installed and functional<br>

  • Distribution board is clean and tidy<br>

  • Dishwasher installed and functional<br>

  • Other white goods installed and functional<br>

  • All AC Equipment are operational<br>

  • All AC Equipment in Auto Mode<br>

  • Extract Fans are in Auto Mode<br>

  • Load schedules available inside DBs<br>

  • All Electrical Sockets, Switches, Isolators labelled<br>

Civil, Joinery and Aluminium work

  • Are all doors/door frames free of scratches and in good condition?<br>

  • Are all doors gaps with in tolerance?<br>

  • Are all doors closing properly?<br>

  • Doors- Alignment of shutter, ironmongery and <br>Architrave

  • "Doors- No colour variance between architrave and shutter <br>or in the veneer itself"<br>

  • Doors- Approved hinges, no rust or screw missing<br>

  • Doors- Approved Ironmongery without any rust <br>

  • Is the flooring tiles/parquet in good condition?<br>

  • Is the floor grouting colour consistent?<br>

  • Is floor grouting free of gaps?<br>

  • Tiles Colour variation & texture variation<br>

  • Slopes in wet areas towards floor drains<br>

  • Are all wall corners aligned and straight?<br>

  • Is termination between wall and ceiling are straight and with good finishing?<br>

  • No undulation was observed on walls and ceiling<br>

  • Is the grouting and silicon in the kitchen in good condition?<br>

  • Are all doors and kitchen cabinets free of scratches and in good condition? <br>

  • Are all cabinets cleaned and free of construction material?<br>

  • Wardrobes & cabinet- No colour variation in the shutters<br>

  • Wardrobes & cabinet- Gap between shutters is equal and uniform<br>

  • Wardrobes & cabinet- Hinges No rust, no missing screw<br>

  • Wardrobes - Uniform joint Architrave<br>

  • "Wardrobes & cabinet - Carcass No scratches No damages and all screw <br>caps are fixed"<br>

  • Wardrobes - Joints of carcass properly terminated <br>

  • "Wardrobes - Shelves in Alignment with no damages or <br>chipping "<br>

  • "Wardrobes & cabinet- Drawers to be in Alignments and No scratch, <br>dent or other damages"<br>

  • "Wardrobes - LED Lights if available to be checked in sensor <br>upon opening and closing"<br>

  • "Cabinet shelves in Alignment with no damages or <br>chipping"<br>

  • "Kitchen Countertop Marble/granite No stains, <br>Not chipped or broken or cracked"<br>

  • "Termination of countertop with adjacent surfaces <br>and back splash (proper uniform application of <br>silicon)"<br>

  • "Cutting of countertop for the sink hole to be <br>properly done and the around finishing should be <br>adequately done"<br>

  • "Countertop edges to be chamfered uniformly and <br>as per approved sample"<br>

  • Sink clear from scratches and stains <br>

  • Mixers to be fixed firmly<br>

  • "Cabinets handles should be in alignment, Not rusted <br>and fixed properly"<br>

  • Are all skirting installed and free of gaps?<br>

  • Fire Extinguisher and fire blanket is installed and in good condition<br>

  • No gaps between walls and ceiling termination<br>

  • Is the mirror in good condition? <br>

  • Is the grouting and silicon in the toilet in good condition?<br>

  • Is under cabinets properly finished?<br>

  • Are the walls properly painted?<br>

  • "paint of walls uniforms in colour & texture without <br>patches, spots, dirt’s, smudges "<br>

  • Painting linear on top of skirting<br>

  • Painting of shadow gap<br>

  • Access panel paining<br>

  • Terminations around all MEP surfaces<br>

  • "10-15 cm above shadow angle or from the <br>soffit of the slab to be plastered and primer <br>painted"<br>

  • "Checking the AC ducting are not in conflict <br>with the suspension system"<br>

  • "Bitumen layers anti-bacterial, anti-fungus as <br>specified"<br>

  • Level of ceiling, non-undulated, No sagging<br>

  • Linearity of Bulkhead, edges and shadow gaps<br>

  • "Shadow Angles should be uniform and gap to be <br>uniform"<br>

  • Equal gaps around access panels<br>

  • Is the unit clean?<br>

  • Are all door stoppers installed and in good condition?<br>

  • Is there any broken/ scratched glass?<br>

  • Are balcony doors and windows working properly? Locks working?<br>

  • Are all aluminium work free of scratches paint stains? <br>

  • "Alignment of Aluminium frames to be <br>checked with no defect "<br>

  • "Proper finishing at the joints and around <br>the Aluminium frame,"<br>

  • "Aluminium & Glass - Silicon applied properly in linear lines, <br>and in equal gaps"<br>

  • Glass to be clear from the scratch<br>

  • "Aluminium & Glass -Handles and Accessories to be fixed in <br>alignment and rain stoppers should be <br>fixed as well,"<br>

  • Metal Works - Fixing as per approved MS and drawings,<br>

  • "Metal Works - Checking the paining, scratch, rust, quality of <br>texture and colour"<br>

  • "Metal Works - Alignment of any metal member should be done <br>properly"<br>

  • "Metal Works - Safety considerations in all metal works to be <br>considered"<br>

  • "Marble - No cracks, no variation in colour, No dents, No <br>veins, proper edges chamfering and as per approved <br>sample, Proper polishing if specified"<br>

  • Is fly mesh installed properly without damage?<br>

  • Is there any wall gaps above false ceiling?<br>

  • All skirting with proper alignment and terminated properly to the wall? <br>

  • Is shower floor area with proper slope?<br>

  • Above ceiling is free from any construction waste/stored items?<br>

  • Plaster hollow Sound<br>

Electrical Work:

  • Is the door bell/intercom working?<br>

  • Are all lights working?<br>

  • Are all sockets and switches working?<br>

  • Is water heater working?<br>

  • All wires are terminated properly?<br>

  • Is DB load schedule available?

HVAC System

  • Is AC working Properly? Room Temp is achieving 22-23 Degree<br>

  • Is AC cooling? Not noisy? AC thermostat in good condition? <br>

  • Is FCU actuator is automatically closing?<br>

  • Is FCU U trap is installed with proper slope?<br>

  • No condensation observed on the chilled water pipe insulation.<br>

  • Filters and ducts are cleaned?<br>

  • All fresh air intake dampers are opened as per testing and commissioning report?<br>

  • The FCU units are accessible for maintenance (Filters, Actuators, strainers are reachable)<br>

Plumping System and Sanitary ware

  • Is the wash basin and mixer working and in good condition?<br>

  • All floor trap cover are installed?<br>

  • No half moon appear for drains and floor traps?<br>

  • All floor trap cover are installed?<br>

  • Is WC seat and seat cover in good condition?<br>

  • Is the hand spray working and in good condition?<br>

  • Is the bathtub/shower in good condition with the shower mixer and shower head?<br>

  • Are all bathroom accessories (soap dish, towel holder, tissue holder, etc...) available and in good condition?<br>

  • Is Flushing mechanism is working properly?<br>

Testing

  • Wall tested and scanned for moisture?<br>

  • Air supply temperature is checked?<br>

  • Noise level for FCUs and extract fans are check and found with in acceptable range?<br>

  • All sockets are tested with socket tester?<br>

  • fiber optic cable is tested?<br>

  • Thermal imaging is conducted to identify possible leaks from building envelope?<br>

  • Humidity ratio was obtained and found in acceptable level?<br>

  • Pressure test for plumping system is conducted?<br>

  • Drains are clear from blockage?<br>

  • Ponding test is conducted and passed for bathtub sides?<br>

  • Floor and wall tile taping test is done and free from hollowness?<br>

  • Testing and Commissioning of distribution Board<br>

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.